
Enable job alerts via email!
Generate a tailored resume in minutes
Land an interview and earn more. Learn more
A leading power production company in Malaysia is seeking a Senior Electrical Engineer to manage daily electrical maintenance activities at their Power Station. The role involves overseeing compliance with safety and legal regulations, preparing work instructions, and ensuring effective maintenance to optimize plant performance. The ideal candidate will have a bachelor's degree in electrical engineering, at least 6 years of relevant experience, and strong leadership skills, with the ability to communicate effectively in both English and Bahasa Malaysia.
Add expected salary to your profile for insights
The Senior Electrical Engineer is responsible for the daily Electrical maintenance activities at the Power Station, including the identification of maintenance requirements and their integration into a long term plan. The Senior Electrical Engineer is the person in-charged for the preparation and execution of all Electrical work carried out during planned and unplanned outages of major equipment. Manage the daily EC&I maintenance of the Power Station so that all requirements are identified, documented, planned, scheduled and carried out correctly, and that a history of details of work carried out is available in the Computerised Maintenance Management System (CMMS).
Note: This is a 4-year fixed term contract role.
Salary match Number of applicants Skills match
Edra Power Holdings Sdn Bhd (“Edra”) owns and operates 8 power plants in Malaysia, Egypt and Bangladesh. It also has investments in a power asset in Pakistan, as well as a power and desalination asset in the United Arab Emirates.
Edra is the second largest independent power producer (IPP) in Malaysia, with a total generating capacity of 5,087 MW and effective capacity of 4,568.3 MW from its 5 power plants, which consist of 3 combined cycle gas turbine plants (one with co-generation facilities), one coal-fired sub-critical thermal power plant and one large scale solar photovoltaic plant.
In Egypt, the Group owns and operates one 682.5 MW gas-fired conventional thermal power.
In Bangladesh, the Group owns and operates two CCGT power plants, with a total generating capacity of 810 MW and effective capacity of 445.5 MW.
The Group has an investment in a 157 MW combined cycle gas-fired baseload power station located in Pakistan. Its effective capacity is 36 MW.
Edra is also part of a consortium that owns and operates the Taweelah B IWPP, the largest independent water and power project in the UAE. The Group has a 10.0% effective interest in the Taweelah B IWPP, which has a total power generation and desalination capacity of 2,000 MW and 160 MIGD.
The Group’s revenues are mainly derived from the available capacity and electrical energy produced by its power plants to the off-taker under their respective Power Purchase Agreements ("PPAs").
Tenaga Nasional Berhad is our sole off-taker in Malaysia, while Egyptian Electricity Holding Company and Bangladesh Power Development Board are our sole off-takers in Egypt and Bangladesh respectively. These off-takers are either government or government-linked entities. Our PPAs in Egypt and Bangladesh are guaranteed by the Central Bank of Egypt and Government of Bangladesh respectively, with the substantial majority of payments either denominated in, or indexed to, the USD.
Edra is led by experienced management teams with deep industry knowledge, expertise and established track records, which are further supported by strategic partnerships with reputable global players.
We are looking forward to further expansion opportunities in the markets where we already have a strong foothold as well as in new areas.
Show more
Perks and benefits We offer competitive compensation and benefits pac
Site Engineer / Construction Manager (Electrical, Mechanical & CSA)
3d ago
Researching careers? Find all the information and tips you need on career advice.