Responsible for the production of estimates or part estimates under the appropriate cost code of accounts as required by the contract or requested by the Chief Estimator or Manager, Project Controls.
Ensures estimates are produced to required technical quality. Ensures historical/statistical data are collected in a format suitable for use on future estimates. Ensures maintenance and development of technical work practices as delegated by the Chief Estimator or Manager, Project Controls.
Allocated projects, irrespective of size, that require a capital cost estimate to be conducted, have the appropriate documentation in place to record the estimate methodology and basis, the cost estimate itself, and necessary backup documentation.
Estimate documentation is consistent in format and presentation. The allocated capital cost estimate is commenced with an Estimate Plan, approved by the Client, Senior Estimator, or Manager, Project Control, detailing the methodology to be undertaken in compiling the estimate, appropriate for the expected level of accuracy to be achieved.
The plan is aligned with corporate and contractual procedures as a minimum, but ideally also with internationally recognized best practices such as AACE RP 18R-97. The estimate is developed in accordance with the specific Estimate Plan, reviewed by the Project Team and corporate leadership as required by the relevant delegation of authority and the Client.
Records of the reviews are available, and the estimate is submitted on time. The estimate is saved in the appropriate, correct folder, is concisely indexed and numbered for full future traceability. For projects in the execution phase, actual quantities and costs are compared with the estimate for future reference and quality improvement.
* Le salaire de référence se base sur les salaires cibles des leaders du marché dans leurs secteurs correspondants. Il vise à servir de guide pour aider les membres Premium à évaluer les postes vacants et contribuer aux négociations salariales. Le salaire de référence n’est pas fourni directement par l’entreprise et peut pourrait être beaucoup plus élevé ou plus bas.