Enable job alerts via email!
A leading technical staffing agency is seeking a Maintenance Engineer for a waste-to-energy facility in Singapore. The candidate will coordinate maintenance efforts, implement preventive measures, and assist in the construction and commissioning of various plant systems. The ideal applicant should possess a relevant engineering diploma, with requisite experience preferred. Strong analytical and communication skills, along with proficiency in technical software, are essential for this role.
Be part of the technical team in the operation and maintenance of plant. Your work scope includes:
Coordinate maintenance work between contractors and maintenance sections to ensure the safe, smooth and efficient operations of the waste-to-energy facility.
To implement preventive maintenance and overhaul programs for the facility's electrical and control equipment such as turbo-generators, motors, switchgears, low tension and high tension equipment, distributed control system and field instruments.
To administer contracts for the operation and maintenance of mechanical, EICA or building services equipment
To enforce permit-to-work system and safe work culture including supervising contractors’ work for quality and safety
To formulate and prepare standard operating and safety procedures, equipment testing/ changeover programmes
To perform shift work in a waste-to-energy facility, if needed
To assist engineer to implement initiatives on safety and continuous improvement to enhance the safety culture and standards within the plant, as well as drive projects to achieve operational excellence.
B)
Assist the engineer and supervise plant construction progress.
To work with project consultants and key stakeholders, such as other government agencies, on the design of the various facilities in the plant and ensure that the plant is constructed, erected, installed in accordance with design specifications and complying with statutory requirement.
To participate in the testing, commissioning of mechanical, process, or electrical, instrument, control and automation equipment/systems.
To attend factory acceptance tests (FATs) at local and overseas factories to witness and verify quality and performance of major equipment/systems.
Qualifications:
Diploma in any Engineering course or Nitec in any Engineering course
For Diploma holders, preferably with 3 years of relevant working experience.
For Nitec holders, preferably with 6 – 8 years of relevant working experience
Candidates with professional certification e.g. Licenced Electrical Worker, Boiler Attendant Certificate, Workplace Safety Health Officer, will be given preference
Good technical background and strong analytical skills.
Proficient in Microsoft Office, and preferably in Navisworks and Primavera P6
Mature, independent, resourceful, and a good team player
Good interpersonal communication
Able to work in waste-to-energy facilities
Able to perform rotating shift work over public holidays and weekend if necessary
Interested candidates who wish to apply for the advertised position, please click on “Apply”. We regret that only shortlisted candidates will be notified.
EA License No.: 01C4394 (PERSOLKELLY SINGAPORE Pte Ltd)
By sending us your personal data and curriculum vitae (CV), you are deemed to consent to PERSOLKELLY Singapore Pte Ltd and its affiliates to collect, use and disclose your personal data for the purposes set out in the Privacy Policy available at https://www.persolsingapore.com/policies. You acknowledge that you have read, understood, and agree with the Privacy Policy