Get more replies from employers
Send a job-specific resume in minutes.
Tecnimont Arabia Limited in Jubail, KSA, has awarded a major EPC scope for petrochemical expansion at SATORP Refinery. The role focuses on directing instrumentation activities within Derivatives Units and related HDPE logistics packages, ensuring safety, quality, and schedule adherence.
You will lead subcontractors on site, oversee pre-commissioning and commissioning activities, and contribute to the overall four-year project lifecycle with a strong emphasis on timely delivery.
PIR 439909830
AMIRAL P02&03 4398&4399 KSA
Jubail, KSA
Fixed TermContract
01/08/2026 To 31/07/2027
Rotation of 60days on site and 10 days off (paid) & 2 Travel Days (Paid)
Excellentsalary package with benefits
Single Status.
Accommodationprovided by the company.
Transportationprovided by the company.
Round tripticket on each rotation (Economy class).
Tecnimont andTecnimont Arabia Limited have been awarded two lump-sum turn-key EPCcontracts related to a petrochemical expansion at the SATORP Refinery (a JVcomposed of Saudi Aramco and Total Energies), in Jubail, Kingdom of SaudiArabia.
The overallvalue of the contracts is approximately USD 2 billion. The contracts relateto the execution of two packages of the complex, namely the “DerivativesUnits” package - which includes a butadiene extraction unit, an olefinextraction unit, a methyl tert-butyl ether unit, a butadiene selectivehydrogenation unit, a 2nd stage pygas hydrogenation unit and benzene &toluene extraction unit - and the “High Density Polyethylene (HDPE) &Logistic Area” package, which includes two polyethylene units and therelevant product logistic facilities.
The project’sscope of work entails complete engineering services, equipment and materialsupply, construction activities, pre-commissioning, and commissioning, andshall have a duration of approximately 4 years.
He/she directs subcontractor activities for his owndiscipline, ensuring that plant construction works are performed according to the erection schedules and project documents, within the assigned costbudget, and according to quality & safety procedures, as well asaccording to the terms and conditions of the subcontract.