Tecnimont and Tecnimont Arabia Limited have been awarded two lump-sum EPC contracts for a petrochemical expansion at the SATORP Refinery in Jubail, Kingdom of Saudi Arabia. The project includes Derivatives Units and HDPE & Logistics Area, valued around USD 2 billion, spanning engineering, procurement, construction, pre-commissioning and commissioning over ~4 years.
One supervisor reports to the Construction Manager and directs subcontractor activities, ensuring works align with schedules,
JobTitle: Construction Mechanical Machinery Supervisor
Reference: PIR 439909680/ 439909690 / 439909700
Project: AMIRALP02&03 4398&4399 KSA
JobLocation: KSA
AssignmentPeriod: 01/08/2026- 31/07/2027
Jobtype/Contract: Contractual
Competitivesalary package with benefits
Tecnimont and Tecnimont ArabiaLimited have been awarded two lump-sum turn-key EPC contracts related to apetrochemical expansion at the SATORP Refinery (a JV composed of Saudi Aramcoand Total Energies), in Jubail, Kingdom of Saudi Arabia. The overall value of thecontracts is approximately USD 2 billion. The contracts relate to theexecution of two packages of the complex, namely the “Derivatives Units”package - which includes a butadiene extraction unit, an olefin extractionunit, a methyl tert-butyl ether unit, a butadiene selective hydrogenationunit, a 2nd stage pygas hydrogenation unit and benzene & tolueneextraction unit - and the “High Density Polyethylene (HDPE) & LogisticArea” package, which includes two polyethylene units and the relevant productlogistic facilities. The project’s scope of workentails complete engineering services, equipment and material supply,construction activities, pre-commissioning, and commissioning, and shall havea duration of approximately 4 years.
EachSupervisor reports to the Construction Manager. Hedirects Subcontractor activities for his own discipline, ensuring that PlantConstruction works are performed according to the erection schedules andProject documents, within the assigned cost budget, and according to Quality& Safety procedures, as well as according to the terms and conditions ofthe subcontract. Oneor more assistants may support him.