Lead Data Center Construction Site Manager

Gray

Atlanta (GA)

Presencial

USD 120.000 - 180.000

Jornada completa

Hace 6 días
Sé de los primeros/as/es en solicitar esta vacante

Una candidatura completa en un minuto

Currículum y carta de presentación personalizados, listos para enviar.

Supera los filtros ATS

Descripción de la vacante

Gray Construction is seeking a Site Manager (Data Centers) to lead field operations for hyperscale data center projects in the United States. The role requires directing day-to-day activities from mobilization through commissioning, ensuring safety, quality, and schedule adherence across complex sites.

You will mentor on-site teams, coordinate subcontractors, review drawings and budgets with PM, and travel to multiple project sites nationwide as needed.

Formación

  • Industrial construction experience (5+ years)
  • Data center/mission-critical project exposure
  • On-site leadership and team management
  • Scheduling and coordination
  • Safety compliance and risk management
  • Reading and interpreting architectural/engineering drawings
  • Willingness to travel for nationwide projects

Responsabilidades

  • Lead day-to-day field operations for complex, mission-critical data center construction projects.
  • Oversee construction activities from site mobilization through final turnover and commissioning.
  • Own the field activities: safety, quality, schedule, planning, logistics, on-site team leadership, subcontractor coordination.
  • Maintain and update a 2-3 week lookahead schedule; provide real-time data to PM/Scheduler.
  • Ensure site safety compliance; stop work when violations occur and counsel subs/team members.
  • Lead meetings to coordinate subcontractor activities and maintain project alignment with schedule.
  • Mentor and develop subordinates; establish a safe, professional jobsite culture.
  • Review drawings and contract documents; coordinate changes; manage budgets with PM.
  • Assist in subcontractor procurement, pre-award meetings, and closeout procedures.
  • Travel to project sites nationwide; coordinate buyout and procurement on schedule.

Descripción del empleo

Gray Construction is seeking a Site Manager (Data Centers) to lead field operations for hyperscale data center projects in the United States. The role requires directing day-to-day activities from mobilization through commissioning, ensuring safety, quality, and schedule adherence across complex sites.

You will mentor on-site teams, coordinate subcontractors, review drawings and budgets with PM, and travel to multiple project sites nationwide as needed.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Data Center Site Lead — Mission-Critical Builder
Data Center Site Lead — Mission-Critical Builder

Gray • Jackson (MS)

Presencial
USD 110.000 - 150.000
Data Center Site Manager - Hyperscale Field Lead
Data Center Site Manager - Hyperscale Field Lead

Gray • Lexington (KY)

Híbrido
USD 90.000 - 150.000
Data Center Site Manager - Hyperscale Field Lead
Data Center Site Manager - Hyperscale Field Lead

Gray-Construction-f9b31407 • Lexington (KY)

Presencial
USD 110.000 - 170.000
Data Center Field Lead for Mission-Critical Construction
Data Center Field Lead for Mission-Critical Construction

Gray • Charlotte (NC)

Presencial
USD 120.000 - 180.000
Data Center Field Operations Lead
Data Center Field Operations Lead

Gray • Louisville (KY)

Presencial
USD 90.000 - 140.000
Data Center MEP Site Lead | Field Operations
Data Center MEP Site Lead | Field Operations

Gray • Reno (NV)

Presencial
USD 120.000 - 180.000
Data Center MEP Site Lead
Data Center MEP Site Lead

Gray • Atlanta (GA)

Presencial
USD 120.000 - 170.000
MEP Site Lead – Data Center Construction
MEP Site Lead – Data Center Construction

Gray • Lexington (KY)

Híbrido
USD 120.000 - 180.000
MEP Site Lead — Hyperscale Data Centers
MEP Site Lead — Hyperscale Data Centers

Gray • Louisville (KY)

Presencial
USD 120.000 - 180.000
Data Center MEP Site Lead
Data Center MEP Site Lead

Gray Construction Services, Inc. • Lexington (KY)

Presencial
USD 120.000 - 170.000