Doc Control Specialist - Data Center Construction

Sundt Enterprise

Lockhart (TX)

On-site

USD 32,000 - 52,000

Full time

5 days ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Sundt Enterprise is seeking a Records/Document Control Clerk to support project documentation management on site. This role will be the key resource for the organization, maintenance of master project/drawing/specification files, and ensuring the integrity of library records.

Work is performed under general supervision and requires careful attention to detail. You will assist with scanning preparation, document retrieval, transmittal logs, and archiving inactive records.

Qualifications

  • 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
  • Familiarization with Prolog, ERP systems and other related project management software preferred.
  • Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
  • Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
  • Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
  • Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.

Responsibilities

  • Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
  • Handles document retrieval requests, and assists in document reproduction .
  • Maintains the master project/drawing / specification files as the repository of design /construction documents.
  • Maintains transmittal logs and records and ensures compliance.
  • Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
  • Responsible for maintenance of the project electronic and physical library records.
  • Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
  • Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.

Skills

Document management
Microsoft Office
Attention to detail
Organizational skills
Communication skills

Education

High school diploma
Associate's Degree preferred

Tools

Contract Manager
Prolog
ERP systems

Job description

Job Summary

Generally responsible for document management for specific projects and is the key resource for the management of documentation and records at the site. This work will be performed under general supervision.

Key Responsibilities
  • Assists with the document preparation for scanning (i.e., removes all staples, paper clips).
  • Handles document retrieval requests, and assists in document reproduction .
  • Maintains the master project/drawing / specification files as the repository of design /construction documents.
  • Maintains transmittal logs and records and ensures compliance.
  • Organize, prepare and box in-active records for archives, storage, retention and/or destruction.
  • Responsible for maintenance of the project electronic and physical library records.
  • Serves as main contact for file maintenance, quality control and retrieval of physical files within the central library.
  • Supports and maintain the operation of the Electronic Management & Physical File Structure Systems.
Minimum Job Requirements
  • 3-5 years of previous support experience required. Experience with Contract Manager or other contract management tool is preferred.
  • Familiarization with Prolog, ERP systems and other related project management software preferred.
  • Must be detailed oriented, have excellent organizational skills and have the ability to multi-task.
  • Proficiency with Microsoft Office Package; strong understanding of Word, Excel, and Outlook.
  • Requires a high school diploma, Associate's Degree preferred (or equivalent working knowledge/experience).
  • Strong interpersonal and communication skills, both written and verbal, and a professional demeanor are required.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements
  • May stoop, kneel, or bend, on an occasional basis
  • Must be able to comply with all safety standards and procedures
  • Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
  • Will interact with people and technology frequently during a shift/work day
  • Will lift, push or pull objects pounds on an occasional basis
  • Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
  • Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
Safety Level

Safety-Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Doc Control Specialist (Commissioning) - Data Center Construction
Doc Control Specialist (Commissioning) - Data Center Construction

Sundt Enterprise • Temple (TX)

On-site
USD 38,000 - 66,000
Document Control Specialist
Document Control Specialist

Progressive Global Energy • Bridgeport (CT)

On-site
USD 45,000 - 65,000
Document Control Specialist I
Document Control Specialist I

EPITEC • Bangor (ME)

On-site
USD 45,000 - 60,000
Document Controller (19425)
Document Controller (19425)

Arion • Houston (TX)

On-site
USD 50,000 - 70,000
Document Control Specialist/Document Controller
Document Control Specialist/Document Controller

PSG Global Solutions • Bridgeport (CT)

On-site
USD 45,000 - 65,000
Construction Document Control Specialist
Construction Document Control Specialist

JLM Strategic Talent Partners • Saraland (AL)

On-site
Health Insurance
Vision
Dental
+2
Construction Document Control Specialist
Construction Document Control Specialist

JLM Strategic Talent Partners • Chickasaw (AL)

On-site
Health Insurance
Vision
Dental
+2
Construction Document Control Specialist
Construction Document Control Specialist

JLM Strategic Talent Partners • Pennington (AL)

On-site
Health Insurance
Vision
Dental
+2
Document Control Specialist
Document Control Specialist

TUSA TAKRAF USA Inc • Denver (CO)

On-site
Document Control Specialist
Document Control Specialist

Brunel • Waco (TX)

On-site
USD 40,000 - 65,000