Senior Utility Scheduler | Primavera P6 Expert & CPM Leader

Quanta Government Solutions

Provo (UT)

Hybrid

USD 90,000 - 150,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays

Job summary

Summit Line Construction is seeking a Senior Scheduler to lead planning for complex utility projects. You will develop CPM schedules, analyze critical paths, and coordinate with project teams from pre-construction through closeout.

The role combines field insight with rigorous schedule control in a hybrid office setting. The ideal candidate has 6+ years of scheduling experience in utility construction, strong Primavera P6 skills, and the ability to produce clear schedule narratives for owners

Qualifications

  • Minimum 6 years of scheduling experience in electrical utility construction or similar heavy civil projects.
  • Advanced proficiency in Primavera P6 EPPM; ability to build baselines and generate reports.
  • Strong written communication; able to produce schedule narratives for owner submittals.
  • Proficiency with Microsoft Excel for data manipulation and reporting.

Responsibilities

  • Develop and maintain Level 3/4 CPM schedules for transmission, distribution, substation, and renewable projects.
  • Perform critical path analysis, float monitoring, and schedule variance analysis.
  • Prepare monthly schedule narratives and time impact analyses (TIAs).
  • Support delay claims with fragnet logic and contemporaneous schedule analysis.

Skills

Primavera P6
CPM scheduling
Earned value (EVM)
Excel
MS Office Suite
Schedule narratives
CS/PM interface

Tools

Primavera P6 EPPM
Oracle Risk Analysis (Pertmaster)
Procore / B2W

Job description

Summit Line Construction is seeking a Senior Scheduler to lead planning for complex utility projects. You will develop CPM schedules, analyze critical paths, and coordinate with project teams from pre-construction through closeout.

The role combines field insight with rigorous schedule control in a hybrid office setting. The ideal candidate has 6+ years of scheduling experience in utility construction, strong Primavera P6 skills, and the ability to produce clear schedule narratives for owners

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Utility Scheduler | Primavera P6 & CPM Expert
Senior Utility Scheduler | Primavera P6 & CPM Expert

Quanta-Services • El Paso (TX)

Hybrid
USD 95,000 - 150,000
Medical, dental, vision insurance
401(k) with company match
Paid vacation and holidays
+1
Senior Utility Scheduler - P6/CPM Expert | Hybrid
Senior Utility Scheduler - P6/CPM Expert | Hybrid

Summit Line Construction, Inc. • Provo (UT)

Hybrid
USD 110,000 - 170,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Scheduler – Utility Construction (Hybrid)
Senior Scheduler – Utility Construction (Hybrid)

Summit-Line-Constructio • El Paso (TX)

Hybrid
USD 110,000 - 160,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+1
Senior Scheduler Utility Transmission & Substation (Hybrid)
Senior Scheduler Utility Transmission & Substation (Hybrid)

Summit-Line-Constructio • Provo (UT)

Hybrid
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Scheduler - Utility Construction (Hybrid)
Senior Scheduler - Utility Construction (Hybrid)

Summit Line Construction, Inc. • Heber (UT)

Hybrid
USD 95,000 - 135,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and company holidays
+2
Project Scheduler – Primavera P6 Expert (Utility Construction)
Project Scheduler – Primavera P6 Expert (Utility Construction)

Quanta Government Solutions • Draper (UT)

On-site
USD 70,000 - 105,000
PTO starting at Day 1
401K immediate vesting
Medical, Dental & Vision plans
+3
Senior Scheduler - Utility Transmission (Hybrid)
Senior Scheduler - Utility Transmission (Hybrid)

Summit Line Construction • Heber (UT)

Hybrid
USD 90,000 - 130,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+1
Senior Scheduler — Utility Transmission & Substation Projects
Senior Scheduler — Utility Transmission & Substation Projects

Summit Line Construction • El Paso (TX)

Hybrid
USD 120,000 - 170,000
Medical insurance
Dental insurance
401(k) with match
Senior Scheduler – Utility Construction (Hybrid)
Senior Scheduler – Utility Construction (Hybrid)

Quanta Services • Draper (KY)

On-site
USD 120,000 - 150,000
Medical benefits
401(k)
Paid vacation
+3
Senior Scheduler – Utility Transmission & Substation CPM
Senior Scheduler – Utility Transmission & Substation CPM

Quanta Government Solutions • Heber (UT)

On-site
USD 100,000 - 160,000
Medical insurance
401(k) match
Paid vacation
+3