Senior Scheduler – Utility Transmission & Substation CPM

Quanta Government Solutions

Heber (UT)

On-site

USD 100,000 - 160,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Medical insurance
401(k) match
Paid vacation
Life insurance
Disability coverage
Career development

Job summary

Summit Line Construction, a Quanta Services company, is seeking a Senior Scheduler to lead planning and scheduling for complex utility construction projects in the Western U.S. The role collaborates with project management, field operations, and clients to build, maintain, and analyze schedules from pre-construction to closeout.

The Senior Scheduler will develop Look-Ahead schedules, perform critical path analyses, and support delay claims.

Qualifications

  • Minimum 6 years scheduling experience in electrical utility construction.
  • Experience scheduling transmission line, substation, or distribution projects.
  • Advanced proficiency in Primavera P6 EPPM (cloud-hosted).
  • Knowledge of CPM, resource loading, schedule compression, and earned value basics.
  • Ability to write clear, defendable schedule narratives for owner submittals.

Responsibilities

  • Develop and maintain Level 3/4 CPM schedules using Primavera P6 for transmission, distribution, substation, and renewables.
  • Create ground-up schedules with procurement, permitting, ROW, and mobilization milestones.
  • Maintain schedule baselines, perform updates, and develop look-aheads (2/4/8 weeks).
  • Conduct critical path, float, and schedule variance analyses; prepare narrative reports and TIAs.
  • Support delay claims and REA with fragnet logic and contemporaneous analysis; maintain as-built records.
  • Coordinate with procurement and cost control for EVM reporting; assist in owner meetings and negotiations.

Skills

Primavera P6
CPM scheduling
Schedule development
Schedule maintenance
Look-ahead schedules
Critical path analysis
Time impact analyses
Excel
EVM reporting

Education

PMI Scheduling Professional (PMI-SP)
Bachelor's degree

Tools

Procore
B2W
Oracle Risk Analysis (Pertmaster)

Job description

Summit Line Construction, a Quanta Services company, is seeking a Senior Scheduler to lead planning and scheduling for complex utility construction projects in the Western U.S. The role collaborates with project management, field operations, and clients to build, maintain, and analyze schedules from pre-construction to closeout.

The Senior Scheduler will develop Look-Ahead schedules, perform critical path analyses, and support delay claims.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Scheduler: Utility Transmission & Substation
Senior Scheduler: Utility Transmission & Substation

Summit Line Construction, Inc. • El Paso (TX)

Hybrid
USD 90,000 - 140,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+3
Senior Scheduler - Utility Transmission (Hybrid)
Senior Scheduler - Utility Transmission (Hybrid)

Summit Line Construction • Heber (UT)

Hybrid
USD 90,000 - 130,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+1
Senior Scheduler - Transmission & Substation Projects
Senior Scheduler - Transmission & Substation Projects

Summit Line Construction, Inc. • Draper (UT)

Hybrid
USD 110,000 - 150,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior Scheduler — Utility Transmission & Substation Projects
Senior Scheduler — Utility Transmission & Substation Projects

Summit Line Construction • El Paso (TX)

Hybrid
USD 120,000 - 170,000
Medical insurance
Dental insurance
401(k) with match
Senior Scheduler Utility Transmission & Substation (Hybrid)
Senior Scheduler Utility Transmission & Substation (Hybrid)

Summit-Line-Constructio • Provo (UT)

Hybrid
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Scheduler - Utility Construction (Hybrid, 100% Travel)
Senior Scheduler - Utility Construction (Hybrid, 100% Travel)

Summit Line Construction • Draper (UT)

Hybrid
USD 95,000 - 140,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+3
Senior Utility Scheduler - Transmission & Substation
Senior Utility Scheduler - Transmission & Substation

Summit Line Construction • Provo (UT)

Hybrid
USD 90,000 - 130,000
Medical, Dental, Vision insurance
401(k) with company match
Paid vacation & holidays
+2
Senior Scheduler: Utility Construction (Hybrid/Travel)
Senior Scheduler: Utility Construction (Hybrid/Travel)

Quanta Government Solutions • Draper (UT)

Hybrid
USD 90,000 - 130,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and company holidays
+1
Senior Utility Scheduler | Primavera P6 & CPM Expert
Senior Utility Scheduler | Primavera P6 & CPM Expert

Quanta-Services • El Paso (TX)

Hybrid
USD 95,000 - 150,000
Medical, dental, vision insurance
401(k) with company match
Paid vacation and holidays
+1
Junior Scheduler — Utility Construction, P6 & CPM
Junior Scheduler — Utility Construction, P6 & CPM

Summit Line Construction, Inc. • Heber (UT)

Hybrid
USD 55,000 - 75,000
Medical, dental, and vision insurance
401(k) retirement plan with company M
Paid vacation and holidays
+2