Turn this role into an interview — a resume and cover letter built around what this employer wants.
Summit Line Construction is seeking a Senior Scheduler to lead planning for complex utility projects, partnering with project managers, field operations and clients to build, maintain and analyze schedules from pre-construction through closeout.
This role requires advanced Primavera P6 CPM scheduling, baseline development, look-ahead planning, critical path analysis, and integration with cost controls. Travel up to 100% may be required during active phases.
Summit Line Construction is seeking a Senior Scheduler to lead planning for complex utility projects, partnering with project managers, field operations and clients to build, maintain and analyze schedules from pre-construction through closeout.
This role requires advanced Primavera P6 CPM scheduling, baseline development, look-ahead planning, critical path analysis, and integration with cost controls. Travel up to 100% may be required during active phases.