Senior Utility Scheduler - Transmission & Substation

Summit Line Construction

Provo (UT)

Hybrid

USD 90,000 - 130,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical, Dental, Vision insurance
401(k) with company match
Paid vacation & holidays
Life & disability insurance
Career development resources

Job summary

Summit Line Construction in Utah is seeking a Senior Scheduler to lead planning and scheduling for complex utility projects, from pre-construction through closeout. You will work with project management, field operations, and clients to build, maintain, and analyze schedules.

The role requires deep knowledge of Primavera P6, CPM scheduling, and coordination with procurement and field teams. This office-based position offers hybrid flexibility, exposure to large-scale transmission and renewable

Qualifications

  • Minimum 6 years scheduling experience in electrical utility construction.
  • Experience scheduling transmission line, substation, or distribution projects.
  • Advanced proficiency in Primavera P6 EPPM; ability to establish baselines and generate reports.
  • Strong knowledge of CPM, resource loading, and schedule recovery concepts.

Responsibilities

  • Develop and maintain Level 3 and Level 4 CPM schedules for transmission, distribution, substation, and renewable energy projects using Primavera P6.
  • Establish and maintain the schedule baseline with PM and owner; document scope and constraints.
  • Perform updates from field progress, logs, and foreman input on a defined cycle.
  • Develop 2-, 4-, and 8-week look-ahead schedules to support field planning.
  • Coordinate with procurement for material delivery dates and flag float erosion.

Skills

Scheduling
CPM
Primavera P6
Project Controls

Education

PMI-SP / PSP certification

Tools

Primavera P6
Procore
B2W

Job description

Summit Line Construction in Utah is seeking a Senior Scheduler to lead planning and scheduling for complex utility projects, from pre-construction through closeout. You will work with project management, field operations, and clients to build, maintain, and analyze schedules.

The role requires deep knowledge of Primavera P6, CPM scheduling, and coordination with procurement and field teams. This office-based position offers hybrid flexibility, exposure to large-scale transmission and renewable

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Scheduler Utility Transmission & Substation (Hybrid)
Senior Scheduler Utility Transmission & Substation (Hybrid)

Summit-Line-Constructio • Provo (UT)

Hybrid
USD 90,000 - 130,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Scheduler — Utility Transmission & Substation Projects
Senior Scheduler — Utility Transmission & Substation Projects

Summit Line Construction • El Paso (TX)

Hybrid
USD 120,000 - 170,000
Medical insurance
Dental insurance
401(k) with match
Senior Scheduler - Transmission & Substation Projects
Senior Scheduler - Transmission & Substation Projects

Summit Line Construction, Inc. • Draper (UT)

Hybrid
USD 110,000 - 150,000
Medical insurance
Dental insurance
Vision insurance
+2
Senior Scheduler: Utility Transmission & Substation
Senior Scheduler: Utility Transmission & Substation

Summit Line Construction, Inc. • El Paso (TX)

Hybrid
USD 90,000 - 140,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+3
Senior Scheduler - Utility Transmission (Hybrid)
Senior Scheduler - Utility Transmission (Hybrid)

Summit Line Construction • Heber (UT)

Hybrid
USD 90,000 - 130,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and holidays
+1
Senior Scheduler – Utility Transmission & Substation CPM
Senior Scheduler – Utility Transmission & Substation CPM

Quanta Government Solutions • Heber (UT)

On-site
USD 100,000 - 160,000
Medical insurance
401(k) match
Paid vacation
+3
Senior Utility Scheduler - P6/CPM Expert | Hybrid
Senior Utility Scheduler - P6/CPM Expert | Hybrid

Summit Line Construction, Inc. • Provo (UT)

Hybrid
USD 110,000 - 170,000
Medical insurance
Dental insurance
Vision insurance
+5
Senior Scheduler - Utility Construction (Hybrid)
Senior Scheduler - Utility Construction (Hybrid)

Summit Line Construction, Inc. • Heber (UT)

Hybrid
USD 95,000 - 135,000
Medical, dental, and vision insurance
401(k) with company match
Paid vacation and company holidays
+2
Junior Scheduler: Power & Substation Project Controls
Junior Scheduler: Power & Substation Project Controls

Summit Line Construction • Heber (UT)

Hybrid
USD 55,000 - 75,000
Medical insurance
401(k) retirement plan
Paid vacation & holidays
+1
Junior Scheduler - Powerline & Substation Projects
Junior Scheduler - Powerline & Substation Projects

Summit Line Construction, Inc. • El Paso (TX)

Hybrid
USD 55,000 - 85,000
Medical, dental, and vision insurance
401(k) retirement plan with company 匹
Paid vacation and company holidays
+2