Get more replies from employers
Send a job-specific resume in minutes.
RTX is seeking a Program Cost Control Analyst EBA (Grade P3) to support Engineering Product Team Leads, Control Account Managers, and Program leads in monthly Earned Value Management (EVM) inputs, reporting, and analysis. The role emphasizes cost control, schedule management, and EVMS processes using SAP/APEX tools in a hybrid US-based setting.
The candidate will assist with EAC/LRE, BCRs, and variance analysis, partnering with engineering and program leads to deliver predictable cost
RTX is seeking a Program Cost Control Analyst EBA (Grade P3) to support Engineering Product Team Leads, Control Account Managers, and Program leads in monthly Earned Value Management (EVM) inputs, reporting, and analysis. The role emphasizes cost control, schedule management, and EVMS processes using SAP/APEX tools in a hybrid US-based setting.
The candidate will assist with EAC/LRE, BCRs, and variance analysis, partnering with engineering and program leads to deliver predictable cost