Data Center Construction Supervisor

The Archetype Strategy

Phoenix (AZ)

Sur place

USD 70 000 - 90 000

Plein temps

14 jours+
Générateur de candidature

Transformez ce poste en entretien — un CV et une lettre de motivation conçus selon ce que cet employeur recherche.

Passez les filtres ATS

Résumé du poste

The Archetype Strategy in Phoenix, Arizona, is looking for a Foreman/Supervisor to manage teams of technicians in a mission-critical data center. Applicants should have 5+ years of experience in data center environments and strong leadership skills. Responsibilities include supervising installation work, ensuring quality and safety standards, and mentoring team members. The position offers full-time employment, and candidates who are bilingual in Spanish and English are preferred.

Qualifications

  • 5+ years of experience in data center, electrical, or low-voltage environments.
  • 2+ years in a supervisory or foreman role.
  • Strong understanding of ANSI/TIA, BICSI, and OSHA standards.

Responsabilités

  • Supervise installation crews to ensure project specifications are met.
  • Conduct toolbox talks enforcing safety protocols.
  • Mentor and train crew members while providing performance feedback.

Connaissances

Leadership in team management
Knowledge of data center infrastructure
Communication skills
Ability to read technical drawings
Bilingual (Spanish/English)

Outils

Procore
PlanGrid

Description du poste

The Archetype Strategy in Phoenix, Arizona, is looking for a Foreman/Supervisor to manage teams of technicians in a mission-critical data center. Applicants should have 5+ years of experience in data center environments and strong leadership skills. Responsibilities include supervising installation work, ensuring quality and safety standards, and mentoring team members. The position offers full-time employment, and candidates who are bilingual in Spanish and English are preferred.
Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Dallas (TX)

Sur place
USD 70 000 - 90 000
Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Atlanta (GA)

Sur place
USD 70 000 - 90 000
Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Salt Lake City (UT)

Sur place
USD 70 000 - 90 000
Data Center Site Supervisor - Lead 30+ Technicians
Data Center Site Supervisor - Lead 30+ Technicians

Archetype Infrastructure Solutions • Phoenix (AZ)

Sur place
USD 60 000 - 80 000
Data Center Team Lead: Drive Field Installations & Safety
Data Center Team Lead: Drive Field Installations & Safety

The Archetype Strategy • Las Vegas (NV)

Sur place
USD 70 000 - 90 000
Data Center Project Lead - Field Ops & Safety
Data Center Project Lead - Field Ops & Safety

The Archetype Strategy • San Antonio (TX)

Sur place
USD 70 000 - 90 000
Data Center Field Supervisor - Lead 30-50 Techs
Data Center Field Supervisor - Lead 30-50 Techs

Archetype Infrastructure Solutions • Las Vegas (NV)

Sur place
USD 70 000 - 90 000
Senior Data Center Construction Project Engineer
Senior Data Center Construction Project Engineer

Vantage Data Centers • Phoenix (AZ)

Sur place
USD 75 000 - 95 000
Comprehensive health and welfare benefits
Paid leave
Training and development opportunities
Data Center Foreman: Lead Field Operations (Travel)
Data Center Foreman: Lead Field Operations (Travel)

The Archetype Strategy • Dallas (TX)

Sur place
USD 85 000 - 125 000
Onsite Superintendent: Mission-Critical Data Center Leader
Onsite Superintendent: Mission-Critical Data Center Leader

GCON Management Company LLC • Phoenix (AZ)

Sur place
USD 90 000 - 120 000
Competitive compensation
100% employee medical/dental coverage
401(k) contributions
+3