Data Center Construction Supervisor

The Archetype Strategy

Salt Lake City (UT)

On-site

USD 70,000 - 90,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

The Archetype Strategy is seeking a Foreman/Supervisor in Salt Lake City, Utah to lead teams of 30–50 technicians in the installation and support of infrastructure within mission-critical data centers. This role involves daily supervision, quality assurance, and project compliance. Candidates should have over 5 years of relevant experience and strong leadership skills. The position requires adherence to safety standards and various technical requirements. Bilingual skills and relevant certifications are a plus, contributing to a collaborative and dynamic work environment.

Qualifications

  • 5+ years of experience in data center, electrical, or low-voltage environments; 2+ years in a supervisory or foreman role.
  • Ability to read blueprints, schematics, and technical drawings.
  • Workers must comply with ANSI/TIA, BICSI, and OSHA standards.

Responsibilities

  • Supervise and coordinate the work of installation crews.
  • Ensure work completion according to project specifications and timelines.
  • Serve as the main point of contact between field teams and project management.

Skills

Leadership
Communication
Team Management
Bilingual (Spanish/English)
Problem Solving
Adaptability

Tools

Procore
PlanGrid

Job description

The Archetype Strategy is seeking a Foreman/Supervisor in Salt Lake City, Utah to lead teams of 30–50 technicians in the installation and support of infrastructure within mission-critical data centers. This role involves daily supervision, quality assurance, and project compliance. Candidates should have over 5 years of relevant experience and strong leadership skills. The position requires adherence to safety standards and various technical requirements. Bilingual skills and relevant certifications are a plus, contributing to a collaborative and dynamic work environment.
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Dallas (TX)

On-site
USD 70,000 - 90,000
Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Phoenix (AZ)

On-site
USD 70,000 - 90,000
Data Center Construction Supervisor
Data Center Construction Supervisor

The Archetype Strategy • Atlanta (GA)

On-site
USD 70,000 - 90,000
Data Center Team Lead Technician
Data Center Team Lead Technician

The Archetype Strategy • Salt Lake City (UT)

On-site
USD 60,000 - 80,000
Data Center Team Lead: Drive Field Installations & Safety
Data Center Team Lead: Drive Field Installations & Safety

The Archetype Strategy • Las Vegas (NV)

On-site
USD 70,000 - 90,000
Data Center Project Lead - Field Ops & Safety
Data Center Project Lead - Field Ops & Safety

The Archetype Strategy • San Antonio (TX)

On-site
USD 70,000 - 90,000
Senior Data Center Construction Lead (Travel‑Ready)
Senior Data Center Construction Lead (Travel‑Ready)

Archetype Infrastructure Solutions • Salt Lake City (UT)

On-site
USD 85,000 - 110,000
Data Center Site Supervisor - Lead 30+ Technicians
Data Center Site Supervisor - Lead 30+ Technicians

Archetype Infrastructure Solutions • Phoenix (AZ)

On-site
USD 60,000 - 80,000
Data Center Field Supervisor - Lead 30-50 Techs
Data Center Field Supervisor - Lead 30-50 Techs

Archetype Infrastructure Solutions • Las Vegas (NV)

On-site
USD 70,000 - 90,000
Data Center Foreman: Lead 30–50 Techs, Safety & Standards
Data Center Foreman: Lead 30–50 Techs, Safety & Standards

Archetype Infrastructure Solutions • Atlanta (GA)

On-site
USD 70,000 - 90,000