A complete application in a minute
Tailored resume and cover letter, ready to send.
Saudi Diesel Equipment Company (SDEC) is seeking a Site Commissioning Engineer to lead on-site power generator commissioning, ensure readiness, coordinate with internal and external stakeholders, and maintain strict safety standards. The role requires a degree in electrical/mechatronics engineering and at least 3 years of related experience.
The engineer will manage documentation, test procedures, and timely reporting of issues, while ensuring equipment installation meets project specifications
Khobar, Saudi Arabia | Posted on 11/18/2026
Saudi Diesel Equipment Company (SDEC)was established in1978, and was formerly known asSaudi Diesel Generators Company.Saudi Diesel Equipment Companyis part of theAbduljawad Group of Companiesincluding Universal Motor Agencies, Barwill Shipping, PLC Arabia, and Saudi Amana Construction.
SDEC started by having a local manufacturing facility to design, develop, and produce its own brandedPower Generatorsets along with power related accessories, this is where SDEC found its niche and became a pioneer in the diesel generators industry, and was able to develop and expand its business over the years.
Today SDEC’s portfolio has expanded to include:Construction, Lifting & Concrete Equipment, Commercial Trucks, Parts & Attachments and Equipment Rentals, The Company continues to grow as a prominent player in the equipment market, providing the highest quality of machineries.
DUTIES AND RESPONSIBILITIES :
1. Prepareall the necessary documents, Tools and equipment required to execute theassigned commissioning on site.
2. Ensurethat the equipment are ready to be commissioned before leaving for site
3. Coordinate closely with Commissioning coordinator, Test line and other internaland external stake holders.
4. Ensureall equipment is installed to its specifications.
5. Ensureall test procedures are completed and done so on time.
6. Report anyissues with the product design or installation.
7. Reviewthe test report and prepare for the site test in advance.
8. Testthe equipment according to the project scope and the approved test report.
9. Reportall defective parts during testing by raising NCR’s
10. Do assignments withinthe budgeted time and per project schedule
11. Review weekly WO StatusReport and plan for the coming week testing efficiently.
12. Get clarifications fromthe testing and Commissioning manager as necessary.
13. Inform productionmanager of any difficulties and any shortages in test line materials or testequipment.
14. Monitor the calibrationschedule of all commissioning instruments.
15. Do other tasks andmissions as requested by the management
16. Strictly follow healthand safety guidelines and ensure it’s followed by the team.
QUALIFICATIONS/ TRAINING COURSES :
Degree in electrical/mechatronics engineering
KNOWLEDGE/ SKILLS:
Experience:
Minimum of 3 years pertinent experience
Minimum of 2 years in the Site commissioning in power generationindustry