Robotics Field Service Engineer — 100% Travel & Uptime Impact

Formic

Salt Lake City (UT)

On-site

USD 40,000 - 61,000

Full time

23 hours ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Equity in Formic
Comprehensive Healthcare Coverage
Home Office Stipend
Monthly Cell Phone Reimbursement
Paid Time Off: 15 days

Job summary

Formic is seeking a Robotics Field Service Engineer to be the front line of technical ownership across deployed robotic cells. You will diagnose failures, restore systems to production, perform maintenance, and represent Formic at customer facilities.

This hands-on, high-accountability role requires strong troubleshooting, calm execution during production interruptions, and precise documentation. Your work directly impacts fleet performance and customer satisfaction.

Qualifications

  • 3+ years of hands-on field service experience supporting robotic or industrial automation systems.
  • Strong troubleshooting skills across electrical, mechanical, PLC, or robotic control systems.
  • Ability to read electrical schematics, wiring diagrams, and pneumatic drawings.
  • Experience using CMMS platforms to track and report maintenance activity.
  • Comfortable with travel up to 100%.
  • Clear written and verbal communicator capable of producing structured service documentation.
  • Demonstrated commitment to safety and disciplined field execution.

Responsibilities

  • Perform preventative, corrective, and predictive maintenance on robotic manufacturing cells
  • Respond to remote and on-site escalations, diagnose root causes, and restore systems quickly
  • Provide hands-on technical support to customer operators and maintenance teams
  • Log service activity, asset updates, and spare part requirements in CMMS
  • Coordinate field scheduling and support with customers, vendors, and internal stakeholders
  • Monitor system performance remotely using Formic dashboards and fleet tools
  • Document service work, root cause analysis, and follow-up actions with clarity and precision
  • Identify recurring failure patterns and elevate systemic risks for broader improvement
  • Build professional, trusted relationships with plant managers and site personnel
  • Operate with strict adherence to safety standards, including LOTO and industrial compliance
  • Participate in RCA sessions, audits, and continuous improvement initiatives
  • Continuously expand technical depth across robotics, controls, networking, and industrial systems

Skills

Field service experience
Troubleshooting
Read schematics
CMMS usage
Travel up to 100%
Clear communication
Safety adherence

Tools

CMMS

Job description

Formic is seeking a Robotics Field Service Engineer to be the front line of technical ownership across deployed robotic cells. You will diagnose failures, restore systems to production, perform maintenance, and represent Formic at customer facilities.

This hands-on, high-accountability role requires strong troubleshooting, calm execution during production interruptions, and precise documentation. Your work directly impacts fleet performance and customer satisfaction.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Robotics Field Service Engineer — On‑Site Uptime Specialist
Robotics Field Service Engineer — On‑Site Uptime Specialist

Formic Technologies • San Francisco (CA)

On-site
USD 60,000 - 92,000
Equity in Formic
Competitive & Uncapped Commission
Comprehensive Healthcare Coverage
+7
Robotics Field Service Engineer - Travel‑Heavy
Robotics Field Service Engineer - Travel‑Heavy

Formic Technologies • Waco (TX)

On-site
USD 40,000 - 61,000
Equity in Formic
Comprehensive healthcare coverage
Home office stipend
+1
Robotics Field Service Engineer: Onsite Uptime Specialist
Robotics Field Service Engineer: Onsite Uptime Specialist

Formic • Austin (TX)

On-site
USD 83,000 - 126,000
Equity in Formic
Commissions
Healthcare coverage
+7
Robotics Field Service Engineer (Travel 100%)
Robotics Field Service Engineer (Travel 100%)

Formic Technologies • United States

On-site
CAD 49,000 - 63,000
Equity in Formic
Healthcare coverage
401(k)
+4
Robotics Field Service Engineer - Uptime Champion
Robotics Field Service Engineer - Uptime Champion

Formic • San Francisco (CA)

On-site
USD 40,000 - 61,000
Equity in Formic
Healthcare coverage
Home office stipend
+2
Robotics Field Service Engineer: Drive Uptime & Growth
Robotics Field Service Engineer: Drive Uptime & Growth

Formic • Waco (TX)

On-site
USD 40,000 - 61,000
Equity in Formic
Healthcare coverage
401(k) plan
+2
Robotics Field Service Engineer — Onsite Uptime & Repairs
Robotics Field Service Engineer — Onsite Uptime & Repairs

Formic • United States

On-site
USD 83,000 - 92,000
Equity in Formic
Healthcare coverage
401(k) plan
+2
Robotics Field Service Engineer — Onsite Uptime Specialist
Robotics Field Service Engineer — Onsite Uptime Specialist

Formic • Jackson (TN)

On-site
USD 40,000 - 61,000
Equity in Formic
Healthcare coverage
Parental leave
+4
Robotics Field Service Engineer - On-Site Uptime Specialist
Robotics Field Service Engineer - On-Site Uptime Specialist

Formic Technologies • Chicago (IL)

On-site
USD 40,000 - 61,000
Equity in Formic
Competitive commission structure
Healthcare coverage
+3
Robotics Field Service Engineer - Uptime & Automation
Robotics Field Service Engineer - Uptime & Automation

Formic • Chicago (IL)

On-site
USD 40,000 - 61,000
Equity in Formic
Comprehensive Healthcare Coverage
Company-sponsored 401(k)
+3