Production Planner: ERP/MRP Master for Critical Programs

Voyager Technologies, Inc.

Pueblo County (CO)

On-site

USD 65,000 - 85,000

Full time

9 days ago
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Benefits offered by this job

Flexible Time Off
Medical, dental, vision coverage
401(k) with company match
Wellness programs

Job summary

Voyager Technologies in Pueblo, CO is seeking a Production Planner to manage material requirements planning within the ERP/MRP system and ensure data accuracy for production decisions. You will release work orders, maintain data integrity, and support scheduling across the plant in a fast-paced environment.

The role requires 2–4 years of manufacturing planning experience, strong ERP/MRP skills (NetSuite preferred), and proficiency in Excel.

Qualifications

  • 2–4 years of production planning, materials planning, or MRP execution experience in a manufacturing environment.
  • Hands-on experience operating within an ERP/MRP system — releasing work orders, managing open order exceptions, and maintaining planning data; NetSuite experience a plus.
  • Solid working knowledge of MRP concepts: BOM explosion, routing, lead time offsetting, safety stock, reorder points, and MRP exception management.
  • Strong attention to detail and data discipline — this role’s primary output is accurate information that others depend on.
  • Organized and systematic; able to manage a high volume of open work orders and planning transactions without losing accuracy.
  • Proficient in Microsoft Office, including Excel; experience building and maintaining planning reports from ERP data exports.

Responsibilities

  • Execute material requirements planning (MRP) runs within NetSuite — review system-generated suggestions, release work orders and purchase requisitions, and manage the planning horizon on a daily and weekly basis.
  • Own ERP/MRP data integrity for the planning function: BOMs, routings, item lead times, safety stock levels, reorder points, and planning parameters — identify errors, correct them, and prevent them from recurring.
  • Manage open work order status through the production lifecycle — from release through completion — ensuring work orders accurately reflect floor reality and that discrepancies between system and physical status are resolved promptly.
  • Maintain lot and batch traceability in production scheduling for energetics programs, including propellant grain manufacturing and batch mix operations, in compliance with AS9100 and production traveler requirements.
  • Translate the Master Scheduler’s program-level schedule into work order release timing, material availability requirements, and purchase requisition timing — the Planner executes what the Scheduler has set.
  • Identify material shortages and supply gaps visible in the MRP system; communicate these to the Production Expeditor for action and to the Master Scheduler if a schedule impact is likely.
  • Coordinate purchase requisition timing with the Buyer I to ensure procurement lead times align with work order start dates and production requirements.
  • Support ERP/MRP go-live readiness — data validation, item master cleansing, planning parameter setup, and testing of scheduling outputs before the system drives live production decisions.
  • Support the Production Expeditor with system-level information — delivery dates, open order quantities, inventory positions — when floor-level escalation requires system context.
  • Develop and maintain standard planning reports showing work order status, MRP exception messages, and material availability — the data layer that informs both the Scheduler and Expeditor.

Skills

MRP concepts
ERP/MRP systems
NetSuite
BOM & routing
Lead times
Safety stock
Reorder points
Data integrity
Excel
MS Office

Education

Bachelor’s degree in supply chain or related field
APICS CPIM certification (preferred)

Job description

Voyager Technologies in Pueblo, CO is seeking a Production Planner to manage material requirements planning within the ERP/MRP system and ensure data accuracy for production decisions. You will release work orders, maintain data integrity, and support scheduling across the plant in a fast-paced environment.

The role requires 2–4 years of manufacturing planning experience, strong ERP/MRP skills (NetSuite preferred), and proficiency in Excel.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Production Planner: Master MRP & Data Integrity
Production Planner: Master MRP & Data Integrity

Voyager Technologies, Inc. • Pueblo (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
Gym memberships
+3
ERP/MRP Production Planner — Space & Defense
ERP/MRP Production Planner — Space & Defense

Voyager Technologies • Pueblo County (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
Gym memberships
+1
ERP/MRP Production Planner — Space & Defense Manufacturing
ERP/MRP Production Planner — Space & Defense Manufacturing

Voyagertechnologiesinc • Pueblo (CO)

On-site
USD 65,000 - 85,000
Medical, dental, and vision coverage
401(k) retirement plan with company a
Wellness programs
+1
Strategic Production Planner - ERP/MRP (NetSuite)
Strategic Production Planner - ERP/MRP (NetSuite)

Voyager Technologies • Pueblo (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
Gym memberships (nationwide)
+2
Senior Master Production Scheduler – Multi-Program Ops
Senior Master Production Scheduler – Multi-Program Ops

Voyager Technologies, Inc. • Pueblo (CO)

On-site
USD 85,000 - 115,000
Flexible Time Off (FTO)
Comprehensive medical, dental, vision
401(k) with company match
+1
Senior Master Production Scheduler Multi-Program Aerospace
Senior Master Production Scheduler Multi-Program Aerospace

Voyager Technologies • Pueblo (CO)

On-site
USD 85,000 - 115,000
Medical, dental, vision coverage
401(k) company match
Flexible time off
+2
Senior Master Production Scheduler — Multi-Program Planning
Senior Master Production Scheduler — Multi-Program Planning

Telemetry Today LLC • Pueblo (CO), Northern (KY)

Hybrid
USD 85,000 - 115,000
Flexible Time Off
Medical/Dental/Vision
Gym Memberships
+3
Production Planner
Production Planner

Voyager Technologies, Inc. • Pueblo (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
Gym memberships
+3
Production Planner
Production Planner

Voyager Technologies, Inc. • Pueblo County (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
401(k) with company match
+1
Production Planner
Production Planner

Voyager Technologies • Pueblo County (CO)

On-site
USD 65,000 - 85,000
Flexible Time Off
Medical, dental, vision coverage
Gym memberships
+1