Document Control Specialist for Data Center Construction

Brunel

Waco (TX)

On-site

USD 40,000 - 65,000

Full time

32 hours ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Brunel is seeking a highly organized Document Control Specialist to support a major data center construction project in the Waco, TX area. You will manage engineering, construction, quality, safety, and project documentation through all phases, ensuring revision integrity and timely access to records.

Responsibilities include controlling drawings, specifications, RFIs, submittals, and logs; maintaining document systems; tracking revisions; and supporting turnover and closeout with accurate,

Qualifications

  • Proven experience in document control within construction or data center projects.
  • Ability to manage large volumes of records, ensure revision integrity and accessibility.
  • Strong proficiency with MS Office and document management systems.

Responsibilities

  • Manage receipt, review, distribution, tracking, filing, and storage of project documentation.
  • Maintain document control systems for drawings, specs, RFIs, submittals, logs, and records.
  • Track revisions and ensure teams use current approved versions.
  • Coordinate distribution of drawings and updates to contractors and stakeholders.
  • Process transmittals while maintaining logs and records.
  • Support turnover and closeout with complete, organized project files.
  • Monitor workflows and follow up on overdue reviews and approvals.
  • Ensure confidentiality and security of project information.

Skills

Document Control
Records Management
Construction Documentation
Engineering Drawings
Revision Control
Project Administration
Data Management
Quality Documentation
Microsoft Office
SharePoint
Procore
Aconex
Attention to Detail

Education

High School Diploma or GED

Tools

Procore
Aconex
Autodesk Construction Cloud
Bluebeam
SharePoint

Job description

Brunel is seeking a highly organized Document Control Specialist to support a major data center construction project in the Waco, TX area. You will manage engineering, construction, quality, safety, and project documentation through all phases, ensuring revision integrity and timely access to records.

Responsibilities include controlling drawings, specifications, RFIs, submittals, and logs; maintaining document systems; tracking revisions; and supporting turnover and closeout with accurate,

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Document Control Specialist
Document Control Specialist

Brunel • Waco (TX)

On-site
USD 40,000 - 65,000
Document Control Coordinator
Document Control Coordinator

Insight Global • Muskogee (OK)

On-site
USD 45,000 - 75,000
Infrastructure Documentation Specialist - Data Centers
Infrastructure Documentation Specialist - Data Centers

xAI • Austin (TX)

On-site
USD 70,000 - 100,000
Data Center Document Control Specialist
Data Center Document Control Specialist

Insight Global • Muskogee (OK)

On-site
USD 45,000 - 75,000
Document Control Lead – Engineering Records
Document Control Lead – Engineering Records

W-Industries of Texas, LLC • Houston (TX)

On-site
USD 60,174,000 - 65,904,000
Salary: 21-23 /hr.
401(k)
Medical, dental, and vision insurance
+4
Document Control Specialist – Construction (North Texas)
Document Control Specialist – Construction (North Texas)

Austin Commercial • Irving (TX)

On-site
USD 70,000 - 110,000
Medical Insurance
Dental Insurance
Life Insurance
+3
Remote Document Control Specialist
Remote Document Control Specialist

Brunel • United States

On-site
USD 55,000 - 75,000
Medical, dental and vision benefits
401K matching 50% up to 3%
Data Center Project Administrator (On-Site)
Data Center Project Administrator (On-Site)

BP Human Resources • New Jersey

On-site
USD 50,000 - 65,000
401(k) matching
Health insurance
Tuition reimbursement
Document Control Specialist – North Texas Construction
Document Control Specialist – North Texas Construction

Austin Industries, Inc. • Town of Texas (WI), Northern (KY)

Hybrid
USD 60,000 - 82,000
Medical, dental, life insurance
401K with matching
Employee ownership (ESOP)
Construction Project Documentation Specialist
Construction Project Documentation Specialist

Whitman,-Requardt- • Washington

On-site
USD 68,880 - 79,900
Leave accrual and paid holidays
Group life insurance
Flexible spending accounts
+4