Wind Turbine Millwright: Build, Install & Align Turbines

Mortenson

Primghar (IA)

On-site

USD 60,000 - 85,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Mortenson is seeking a millwright for the Highland Repower Wind Project in Primghar, IA. You will dismantle, erect, assemble, align, adjust, and maintain wind turbine components according to manuals and drawings.

Responsibilities include offloading major components, nacelle/hub/tower assembly prep, blade-hub connections, crane support, and working at height. Must read safety and maintenance instructions and work with a diverse team.

Qualifications

  • High school diploma or GED is required.
  • Minimum one year of related experience is required.
  • Ability to read and interpret safety regulations, assembly/disassembly, operation and maintenance instructions, and procedure manuals; strong teamwork and customer service skills.

Responsibilities

  • Receive and offload major components.
  • Install loose components for nacelle, hub, and tower preparation.
  • Connect blades to hub.
  • Set base and tower sections.
  • Assist with main erection crane assembly and teardown.
  • Climb ladders (average 80m).
  • Drill and tap holes on turbines, generators, compressors, and pumps.
  • Torque/tension bolted connections.
  • Build relationships with diverse backgrounds and organizational levels.
  • Perform all other duties as assigned.

Skills

Teamwork
Communication
Attention to detail

Education

High school diploma or GED

Job description

Mortenson is seeking a millwright for the Highland Repower Wind Project in Primghar, IA. You will dismantle, erect, assemble, align, adjust, and maintain wind turbine components according to manuals and drawings.

Responsibilities include offloading major components, nacelle/hub/tower assembly prep, blade-hub connections, crane support, and working at height. Must read safety and maintenance instructions and work with a diverse team.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Wind Turbine Millwright for Repower Wind Project
Wind Turbine Millwright for Repower Wind Project

Mortenson Construction • Primghar (IA)

On-site
USD 50,000 - 70,000
Wind Turbine Erection Technician
Wind Turbine Erection Technician

M. A. Mortenson Company • Iowa (LA)

On-site
USD 52,000 - 76,000
Wind Millwright - Highland Repower Wind Project
Wind Millwright - Highland Repower Wind Project

Mortenson • Primghar (IA)

On-site
USD 60,000 - 85,000
Wind Millwright - Highland Repower Wind ProjectWind Millwright - Highland Repower Wind Project [...]
Wind Millwright - Highland Repower Wind ProjectWind Millwright - Highland Repower Wind Project [...]

M. A. Mortenson Company • Iowa (LA)

On-site
USD 52,000 - 76,000
Wind Millwright - Highland Repower Wind Project
Wind Millwright - Highland Repower Wind Project

Mortenson Construction • Primghar (IA)

On-site
USD 50,000 - 70,000
Wind Turbine Assembly & Erection Technician
Wind Turbine Assembly & Erection Technician

M. A. Mortenson Company • Reddick (IL)

On-site
USD 90,000 - 145,000
Mental Healthcare
Craft Dependent Scholarship
Service Awards
+1
Wind Farm Ironworker: Tower Erection & Rebar Specialist
Wind Farm Ironworker: Tower Erection & Rebar Specialist

Mortenson Construction • Primghar (IA)

On-site
USD 55,000 - 75,000
Wind Turbine Assembly & Erection Technician
Wind Turbine Assembly & Erection Technician

Mortenson • Reddick (IL)

On-site
USD 59,000 - 96,000
Mental Healthcare
Craft Dependent Scholarship
Service Awards
+1
Wind Turbine Erection Technician
Wind Turbine Erection Technician

Mortenson Construction • Reddick (IL)

On-site
USD 59,000 - 96,000
Mental Healthcare
Craft Dependent Scholarship
Service Awards
Wind Farm Heavy Equipment Operator
Wind Farm Heavy Equipment Operator

M. A. Mortenson Company • Iowa (LA)

On-site