Senior Construction Scheduling & Analytics Lead

Clark Construction Group

Columbia (SC)

Sur place

USD 140 000 - 260 000

Plein temps

Il y a 27 heures
Soyez parmi les premiers à postuler
Générateur de candidature

Transformez ce poste en entretien — un CV et une lettre de motivation conçus selon ce que cet employeur recherche.

Passez les filtres ATS

Avantages offerts par ce poste

Health/dental/vision benefits
Paid time off
401k with company match
Life insurance
Commuter benefits
Disability insurance

Résumé du poste

The Scheduling Executive at Clark Construction Group will lead planning and scheduling on multiple high impact projects, while contributing to corporate initiatives like training development, data analytics, and trend reporting.

Responsibilities include leading scheduling efforts, analyzing baselines, guiding Operations teams, and developing Time Impact Analyses. Regular travel to project sites is required, with a strong emphasis on analytics and cross-functional collaboration.

Qualifications

  • Undergraduate degree in Engineering, Architecture, Construction Management or a related discipline.
  • 10+ years scheduling experience on construction projects.
  • Scheduling experience on advanced manufacturing projects preferred.
  • Proven success implementing strategic initiatives.
  • Detail oriented and can manage multiple priorities in a fast-paced environment with minimal guidance.
  • Skilled at developing and maintaining relationships with owners, subcontractors, senior leaders and project teams.
  • High degree of initiative, personal responsibility, and integrity.
  • Advanced proficiency in Primavera (P6) software.
  • Alignment to Clark Standards of Excellence: Self-Motivated, Results Oriented, Adaptable, Team Player, Accountable, Ethical, Innovative, Resilient, Builds Relationships, Builds People / Teams & Followership, Sets Direction & Executes

Responsabilités

  • Lead scheduling efforts across multiple projects.
  • Understand and implement accepted Planning & Scheduling Best Practices.
  • Analyze drawings, specifications, and statements of work in the preparation and acceptance of usable Baseline schedules for construction.
  • Monitor multiple project schedules being developed and updated by Operations staff and provide guidance as necessary.
  • Interact with the Operations team and represent Clark and its partners in the best manner to owners, subcontractors, and their representatives.
  • Support the development of conceptual bid and proposal schedules with executive management and present to selection committees if required.
  • Utilize analytics to identify and report on project trends.
  • Effectively cost and manpower load schedules for use during the execution of the project.
  • Evaluate the actual construction status relative to proposed plan.
  • Analyze and communicate the impact of changes to the schedule.
  • Prepare Time Impact Analyses per recommended practices by commonly accepted standards.
  • Develop and deliver specialized Planning, Scheduling and other Project Controls training for Clark Corporate University
  • Critique, create, and recommend improvements to departmental policies and procedures
  • Be responsible for special projects and other departmental duties as necessary
  • Frequently travel to project sites

Connaissances

Scheduling leadership
Multi-project coordination
Stakeholder management
Detail oriented
Fast-paced environment

Formation

Undergraduate degree in Engineering/Architecture/Construction Management

Outils

Primavera P6

Description du poste

The Scheduling Executive at Clark Construction Group will lead planning and scheduling on multiple high impact projects, while contributing to corporate initiatives like training development, data analytics, and trend reporting.

Responsibilities include leading scheduling efforts, analyzing baselines, guiding Operations teams, and developing Time Impact Analyses. Regular travel to project sites is required, with a strong emphasis on analytics and cross-functional collaboration.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Senior Construction Scheduler & Project Controls Lead
Senior Construction Scheduler & Project Controls Lead

Clark Construction Group, LLC • États-Unis

Sur place
USD 140 000 - 260 000
Life insurance
Commuter benefit
Short & long term disability
+7
Senior Scheduling Exec - Construction Programs & Analytics
Senior Scheduling Exec - Construction Programs & Analytics

Clark Holdings Inc. • Northern (KY)

Hybride
USD 140 000 - 260 000
Health insurance
Dental & Vision benefits
Paid time off
+1
Construction Project Scheduler & Planning Lead
Construction Project Scheduler & Planning Lead

Clark Construction Group • Dallas (TX)

Sur place
USD 90 000 - 130 000
Project Scheduler | Construction Planning & Analytics
Project Scheduler | Construction Planning & Analytics

Clark Construction Group, LLC • Nashville (TN)

Sur place
USD 85 000 - 110 000
Mission-Critical Project Scheduler, Construction & Analytics
Mission-Critical Project Scheduler, Construction & Analytics

Clark Construction Group, LLC • États-Unis

Sur place
USD 90 000 - 130 000
Construction Project Scheduler & Planning Lead
Construction Project Scheduler & Planning Lead

Clark Construction Group, LLC • Atlanta (GA)

Sur place
USD 85 000 - 110 000
Construction Project Scheduler — Travel to Sites
Construction Project Scheduler — Travel to Sites

Clark Construction Group • Houston (TX)

Sur place
USD 85 000 - 115 000
Project Scheduler: Construction & Analytics Lead
Project Scheduler: Construction & Analytics Lead

Clark Construction Group, LLC • Haskell (TX)

Sur place
USD 90 000 - 140 000
Senior Construction Scheduler & Project Controls Lead
Senior Construction Scheduler & Project Controls Lead

Clark Construction Group, LLC • Houston (TX)

Sur place
USD 140 000 - 260 000
Construction Project Scheduler & Controls Lead
Construction Project Scheduler & Controls Lead

Clark Construction Group • El Paso (TX)

Sur place
USD 70 000 - 100 000