Powder Coat Line Finisher - 1st Shift

Eaton Group

Sherman (TX)

On-site

USD 23,000 - 33,000

Full time

11 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Eaton’s ES GEIS BLD division is seeking a Finishing Load/Unload associate on the 1st shift in Sherman, TX. The role pays $20.21 per hour. Core hours are 6:00am–2:30pm. Salary guidance is based on skills, experience, and market conditions.

You will hang/remove parts from the load bar, record hours and load bar data, and perform painting prep tasks including masking, wrapping, and touch-up work. Working on a team, you may lift up to 75 lbs and perform 5S/continuous improvement activities.

Qualifications

  • High school diploma or equivalent from an accredited institution.
  • No relocation benefit; must reside in Sherman, TX area.
  • Eaton will not sponsor immigration for this position.
  • Experience with powder painting (preferred).
  • Experience in a production environment (preferred).
  • Ability to lift 50 lbs occasionally to 75 lbs occasionally; stand for long shifts.

Responsibilities

  • Hang or remove parts from the load bar on the painting line.
  • Record pieces, hours and load bar information on computer.
  • Carry and lift parts to/on painting production line.
  • Perform visual inspections before and after painting.
  • Assist with masking, wrapping and touch-up painting as needed.
  • Maintain components and supplies to operate efficiently.
  • Perform 5S and continuous improvement activities.
  • Other duties as assigned.

Skills

Read blueprints
Measuring tools
Teamwork
Attention to detail
Independently work

Education

High school diploma or equivalent

Job description

Eaton’s ES GEIS BLD division is seeking a Finishing Load/Unload associate on the 1st shift in Sherman, TX. The role pays $20.21 per hour. Core hours are 6:00am–2:30pm. Salary guidance is based on skills, experience, and market conditions.

You will hang/remove parts from the load bar, record hours and load bar data, and perform painting prep tasks including masking, wrapping, and touch-up work. Working on a team, you may lift up to 75 lbs and perform 5S/continuous improvement activities.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Paint Line Finisher: Load/Unload 1st Shift
Paint Line Finisher: Load/Unload 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher – 1st Shift Load/Unload
Paint Line Finisher – 1st Shift Load/Unload

Eaton Corporation • Sherman (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher – 2nd Shift
Paint Line Finisher – 2nd Shift

Eaton Group • Tom Bean (TX)

On-site
USD 25,000 - 34,000
Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Powdercoat Painter- 2nd Shift
Finishing Powdercoat Painter- 2nd Shift

Eaton Group • Tom Bean (TX)

On-site
USD 30,000 - 33,000
Powder Coat Painter — 2nd Shift, Quality & Team Impact
Powder Coat Painter — 2nd Shift, Quality & Team Impact

Eaton Corporation • Sherman (TX)

On-site
USD 26,000 - 37,000