Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Group

Sherman (TX)

On-site

USD 23,000 - 33,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Eaton’s ES GEIS BLD division is seeking a Finishing Load/Unload- 2nd Shift in Sherman, TX. The role pays $20.21/hour base with a $1.20/hour shift differential, with core hours 2:30pm to 11:00pm. Responsibilities include handling parts on the paint line, lifting, and performing quality inspections.

Ideal candidates will have a high school diploma, be able to lift up to 50-75 lbs, and work mandatory overtime as needed. Relocation and immigration sponsorship are not offered.

Qualifications

  • High school diploma or equivalent from an accredited institution.
  • Eaton will not sponsor immigration or CPT/OPT/H-1B or related statuses.
  • No relocation benefit; must reside within Sherman, TX area.

Responsibilities

  • Assist paint line performance by hanging/removing parts and recording information.
  • Carry and lift parts to hang/unhang off the painting production line.
  • Perform visual inspections before and after painting.

Skills

Blueprint reading
Measuring tools
Teamwork

Education

High school diploma or equivalent

Tools

None

Job description

Eaton’s ES GEIS BLD division is seeking a Finishing Load/Unload- 2nd Shift in Sherman, TX. The role pays $20.21/hour base with a $1.20/hour shift differential, with core hours 2:30pm to 11:00pm. Responsibilities include handling parts on the paint line, lifting, and performing quality inspections.

Ideal candidates will have a high school diploma, be able to lift up to 50-75 lbs, and work mandatory overtime as needed. Relocation and immigration sponsorship are not offered.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Paint Line Finisher: Load/Unload 1st Shift
Paint Line Finisher: Load/Unload 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000
Paint Line Finisher – 2nd Shift
Paint Line Finisher – 2nd Shift

Eaton Group • Tom Bean (TX)

On-site
USD 25,000 - 34,000
Paint Line Finisher – 1st Shift Load/Unload
Paint Line Finisher – 1st Shift Load/Unload

Eaton Corporation • Sherman (TX)

On-site
USD 23,000 - 33,000
Powder Coat Line Finisher - 1st Shift
Powder Coat Line Finisher - 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 25,000 - 34,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000