Paint Line Finisher: Load/Unload 1st Shift

Eaton Corporation

Tom Bean (TX)

On-site

USD 23,000 - 33,000

Full time

12 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Eaton's ES GEIS BLD division is seeking a Finishing Load/Unload associate for 1st shift in Sherman, TX. The role pays $20.21 per hour and requires a high school diploma with no relocation benefits; sponsorship is not offered.

Responsibilities include hanging/removing parts on the painting line, recording production data, performing inspections, and assisting with masking, wrapping, and touch-up tasks. Overtime up to 12 hours may be needed.

Qualifications

  • High school diploma or equivalent from an accredited institution.
  • No relocation benefit offered; Sherman, TX residency required.
  • Eaton will not sponsor immigration or work visa for this position.

Responsibilities

  • Hang/remove parts and material from the load bar on the painting production line.
  • Record pieces, hours, and load bar information on the computer.
  • Carry and lift parts to hang/unhang off the painting line.
  • Perform visual inspections of material before and after painting.
  • Assist with masking, wrapping, and touch-up painting as needed.
  • Maintain components and supplies to operate efficiently.
  • Perform 5S and continuous improvement activities.
  • Perform other duties as assigned.

Education

High school diploma or equivalent

Job description

Eaton's ES GEIS BLD division is seeking a Finishing Load/Unload associate for 1st shift in Sherman, TX. The role pays $20.21 per hour and requires a high school diploma with no relocation benefits; sponsorship is not offered.

Responsibilities include hanging/removing parts on the painting line, recording production data, performing inspections, and assisting with masking, wrapping, and touch-up tasks. Overtime up to 12 hours may be needed.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Powder Coat Line Finisher - 1st Shift
Powder Coat Line Finisher - 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher – 1st Shift Load/Unload
Paint Line Finisher – 1st Shift Load/Unload

Eaton Corporation • Sherman (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher – 2nd Shift
Paint Line Finisher – 2nd Shift

Eaton Group • Tom Bean (TX)

On-site
USD 25,000 - 34,000
Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 25,000 - 34,000