Paint Line Finisher – 1st Shift Load/Unload

Eaton Corporation

Sherman (TX)

On-site

USD 23,000 - 33,000

Full time

11 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Eaton Corporation in Sherman, TX is hiring for a Finishing Load/Unload- 1st Shift. The role pays $20.21 per hour with core hours 6:00am to 2:30pm and involves handling parts on the painting line and basic quality checks.

You will perform mounting and unmounting, record piece counts, assist with masking and touch-ups, and maintain supplies to keep the line running smoothly. Overtime and weekend work may be required.

Qualifications

  • High school diploma or equivalent.
  • No relocation benefit offered; Sherman, TX area residents only.
  • Eaton will not provide immigration sponsorship for this position.

Responsibilities

  • Hang and unhang parts on the painting production line.
  • Perform visual inspections of material before and after painting.
  • Mask, wrap, and perform touch-up painting as needed.
  • Maintain components and supplies to operate efficiently.
  • Perform other duties as assigned.

Skills

Blueprint reading
Measuring tools
Attention to detail
Team player
Overtime availability

Education

High school diploma or equivalent

Tools

Measuring tools

Job description

Eaton Corporation in Sherman, TX is hiring for a Finishing Load/Unload- 1st Shift. The role pays $20.21 per hour with core hours 6:00am to 2:30pm and involves handling parts on the painting line and basic quality checks.

You will perform mounting and unmounting, record piece counts, assist with masking and touch-ups, and maintain supplies to keep the line running smoothly. Overtime and weekend work may be required.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000
Paint Line Finisher: Load/Unload 1st Shift
Paint Line Finisher: Load/Unload 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher - 2nd Shift (Load/Unload)
Paint Line Finisher - 2nd Shift (Load/Unload)

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Paint Line Finisher – 2nd Shift
Paint Line Finisher – 2nd Shift

Eaton Group • Tom Bean (TX)

On-site
USD 25,000 - 34,000
Powder Coat Line Finisher - 1st Shift
Powder Coat Line Finisher - 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Tom Bean (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Group • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 1st Shift
Finishing Load/Unload- 1st Shift

Eaton Corporation • Sherman (TX)

On-site
USD 23,000 - 33,000
Finishing Load/Unload- 2nd Shift
Finishing Load/Unload- 2nd Shift

Eaton Corporation • Sherman (TX)

On-site
USD 28,000 - 33,000