Onsite Construction Scheduler – Master CPM & Lookahead

SpaceXAI

Southaven (MS)

On-site

USD 75,000 - 110,000

Full time

48 hours ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

SpaceXAI is seeking a skilled construction scheduler to develop, maintain, and communicate CPM schedules for field teams, subs, and leadership. You will build baselines, update progress, flag risk early, and explain impacts of changes.

This is hands-on work requiring means-and-methods knowledge to challenge infeasible sequences. The role requires coordinating with project managers, superintendents, estimators, procurement, design and owners to ensure schedules reflect committed dates, plus

Qualifications

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks.
  • 4+years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).

Responsibilities

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence.
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare TIAs and what-if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.

Skills

Scheduling
Communication
Site coordination

Education

Bachelor's in construction management or civil engineering
PMI-SP / PMP / PSP / CCM certification

Tools

Oracle Primavera P6
Power BI
Smartsheet
Procore
Navisworks
Synchro

Job description

SpaceXAI is seeking a skilled construction scheduler to develop, maintain, and communicate CPM schedules for field teams, subs, and leadership. You will build baselines, update progress, flag risk early, and explain impacts of changes.

This is hands-on work requiring means-and-methods knowledge to challenge infeasible sequences. The role requires coordinating with project managers, superintendents, estimators, procurement, design and owners to ensure schedules reflect committed dates, plus

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Onsite CPM Construction Scheduler
Onsite CPM Construction Scheduler

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 120,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

Pantera Capital • Southaven (MS)

On-site
USD 55,000 - 90,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 120,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Southaven (MS)

On-site
USD 75,000 - 110,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

Socket.dev • Southaven (MS)

On-site
USD 65,000 - 95,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

x • Memphis (TN), Northern (KY)

Hybrid
USD 90,000 - 130,000
Senior Project Scheduler — Lead CPM & On-Site Delivery
Senior Project Scheduler — Lead CPM & On-Site Delivery

ArchKey Solutions • Fenton (MO)

On-site
USD 85,000 - 110,000
Health insurance
401(k) retirement savings
Remote Project Scheduler | CPM & Construction Planning
Remote Project Scheduler | CPM & Construction Planning

ArchKey Solutions • Clinton (MD)

On-site
USD 65,000 - 90,000
-
Scheduler
Scheduler

FourFive Partners • United States

On-site
USD 90,000 - 130,000
On-Site Data Center Scheduler - Master CPM & Milestones
On-Site Data Center Scheduler - Master CPM & Milestones

Pogue Construction • Terrell (TX)

On-site
USD 90,000 - 130,000