Construction Scheduler - Memphis

SpaceXAI

Southaven (MS)

On-site

USD 75,000 - 110,000

Full time

8 hours ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

SpaceXAI is seeking a skilled construction scheduler to develop, maintain, and communicate CPM schedules for field teams, subs, and leadership. You will build baselines, update progress, flag risk early, and explain impacts of changes.

This is hands-on work requiring means-and-methods knowledge to challenge infeasible sequences. The role requires coordinating with project managers, superintendents, estimators, procurement, design and owners to ensure schedules reflect committed dates, plus

Qualifications

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks.
  • 4+years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).

Responsibilities

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence.
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare TIAs and what-if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.

Skills

Scheduling
Communication
Site coordination

Education

Bachelor's in construction management or civil engineering
PMI-SP / PMP / PSP / CCM certification

Tools

Oracle Primavera P6
Power BI
Smartsheet
Procore
Navisworks
Synchro

Job description

SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our team is small, highly motivated, and focused on engineering excellence. This organization is for individuals who appreciate challenging themselves and thrive on curiosity. We operate with a flat organizational structure. All employees are expected to be hands-on and to contribute directly to the company’s mission. Leadership is given to those who show initiative and consistently deliver excellence. Work ethic and strong prioritization skills are important. All employees are expected to have strong communication skills. They should be able to concisely and accurately share knowledge with their teammates.

SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our team is small, highly motivated, and focused on engineering excellence. This organization is for individuals who appreciate challenging themselves and thrive on curiosity. We operate with a flat organizational structure. All employees are expected to be hands-on and to contribute directly to the company’s mission. Leadership is given to those who show initiative and consistently deliver excellence. Work ethic and strong prioritization skills are important. All employees are expected to have strong communication skills. They should be able to concisely and accurately share knowledge with their teammates.

ABOUT THE ROLE:

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

RESPONSIBILITIES:
  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates).
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.
BASIC QUALIFICATIONS:
  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints).
  • 4+years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
PREFERRED SKILLS AND EXPERIENCE:
  • Bachelor’s in construction management, civil engineering, or a related field — or equivalent field experience.
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
  • Forensic delay analysis, time-impact analysis, and claims support.
  • Cost/resource loading, earned value, and integration with cost systems.
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus.
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud.
ADDITIONAL REQUIREMENTS:
  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence.
  • Must be comfortable working in a fully onsite environment.

SpaceXAI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 120,000
Construction Project Scheduler
Construction Project Scheduler

OnQCx • Boise (ID), Northern (KY)

Hybrid
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Construction Project Scheduler
Construction Project Scheduler

OnQGlobal Inc • Boise (ID)

On-site
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Scheduler
Scheduler

IMC Construction • Port Reading (NJ)

On-site
USD 70,000 - 90,000
Senior Project Scheduler
Senior Project Scheduler

FCL Builders, LLC • Itasca (IL)

On-site
USD 85,000 - 120,000
Health benefits
Flexible hours
Career development opportunities
Construction Scheduler (Mission Critical Business Unit)
Construction Scheduler (Mission Critical Business Unit)

Barton Malow • Sterling (VA), Northern (KY)

Hybrid
USD 100,000 - 135,000
Senior Scheduler
Senior Scheduler

Group PMX • New York (NY)

On-site
USD 180,000 - 220,000
Scheduler
Scheduler

Harvey Cleary • Austin (TX)

On-site
USD 85,000 - 120,000
Lead Scheduler
Lead Scheduler

Rider Levett Bucknall RLB • Milwaukee (WI)

On-site
USD 110,000 - 160,000
Scheduler V - Lead Scheduler
Scheduler V - Lead Scheduler

ENGICON CM • Los Angeles (CA)

On-site
USD 120,000 - 180,000