Construction Scheduler - Memphis

Socket.dev

Southaven (MS)

On-site

USD 65,000 - 95,000

Full time

3 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

SpaceXAI is seeking a seasoned Scheduler to develop, maintain, and communicate CPM schedules for field teams, subcontractors, and leadership. You will build baselines, update progress, flag risks early, and explain the schedule impact of delays and recovery plans.

The role requires hands‑on work on site, a solid understanding of critical path dynamics, and the ability to challenge sequences that won’t work in the field. Equal opportunity employer.

Qualifications

  • 4+ years of construction scheduling on active projects.
  • 4+ years using Oracle Primavera P6 with calendars, relationships, and schedule quality checks.
  • 4+ years with owner/CM specification-driven schedules (DCMA 14-point/USACE).

Responsibilities

  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences.
  • Maintain the live schedule with progress data and cadence‑based updates.
  • Own the critical path and explain end date movements beyond just noting changes.
  • Produce three‑week look‑aheads aligned to the master schedule.
  • Analyze schedule impact of RFIs, change orders, late‑outs, constraints, long‑lead items, weather, and labor shortages; prepare TIAs and recovery scenarios.
  • Coordinate with PMs, supers, estimators, procurement, design, owners/CMs, and subs to reflect committed dates.
  • Resource‑load and cost‑load the schedule where required; flag crew stacking and unrealistic production rates.
  • Prepare narratives, variance reports, S-curves, histograms, and executive summaries.
  • Support claims and delay documentation with contemporaneous records as needed.
  • Enforce schedule standards and version control for auditability.
  • Facilitate pull‑planning / Last Planner and convert commitments into CPM logic.
  • Visit the site regularly to validate the schedule against field reality.

Skills

Construction scheduling
Primavera P6
DCMA 14-point / USACE schedules
Schedule analysis

Education

Bachelor’s in construction management or civil engineering

Tools

Power BI
Smartsheet
Procore
Autodesk Construction Cloud
Navisworks (BIM 4D)

Job description

SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our team is small, highly motivated, and focused on engineering excellence. This organization is for individuals who appreciate challenging themselves and thrive on curiosity. We operate with a flat organizational structure. All employees are expected to be hands‑on and to contribute directly to the company’s mission. Leadership is given to those who show initiative and consistently deliver excellence. Work ethic and strong prioritization skills are important. All employees are expected to have strong communication skills. They should be able to concisely and accurately share knowledge with their teammates.

ABOUT THE ROLE:

Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data‑entry role. You need enough means‑and‑methods knowledge to challenge a sequence that will not work in the field.

Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.

RESPONSIBILITIES:
  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current‑period update on a set cadence (typically weekly look‑aheads and monthly official updates).
  • Own the critical path. Identify near‑critical work, float erosion, and out‑of‑sequence progress. Tell the team why the end date moved, not just that it did.
  • Produce three‑week (or similar) look‑aheads that match the master schedule and what the field can actually crew.
  • Analyze schedule impact of RFIs, change orders, design late‑outs, access constraints, long‑lead procurement, weather, and labor shortages. Prepare time‑impact analyses (TIA) and what‑if, recovery, and acceleration scenarios.
  • Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
  • Resource‑load and, where required, cost‑load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
  • Prepare narratives, variance reports, S‑curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
  • Support claims and delay documentation with contemporaneous records (as‑planned vs. as‑built, fragnets, delay categorization) when needed.
  • Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
  • Facilitate or support pull‑planning / Last Planner sessions and convert those commitments into logic in the CPM model.
  • Visit the site regularly. A scheduler who never walks the job will be wrong.
BASIC QUALIFICATIONS:
  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints).
  • 4+years of experience with owner/CM specification‑driven schedules (e.g., DCMA 14‑point, USACE, or similar quality metrics).
PREFERRED SKILLS AND EXPERIENCE:
  • Bachelor’s in construction management, civil engineering, or a related field — or equivalent field experience.
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
  • Experience with owner/CM specification‑driven schedules (e.g., DCMA 14‑point, USACE, or similar quality metrics).
  • Forensic delay analysis, time‑impact analysis, and claims support.
  • Cost/resource loading, earned value, and integration with cost systems.
  • Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus.
  • Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud.
ADDITIONAL REQUIREMENTS:
  • Willing to work extended hours as needed, including the current 6‑day / 12‑hour construction cadence.
  • Must be comfortable working in a fully onsite environment.

SpaceXAI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Southaven (MS)

On-site
USD 75,000 - 110,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

SpaceXAI • Memphis (TN)

On-site
USD 90,000 - 120,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

Pantera Capital • Southaven (MS)

On-site
USD 55,000 - 90,000
Construction Scheduler - Memphis
Construction Scheduler - Memphis

x • Memphis (TN), Northern (KY)

Hybrid
USD 90,000 - 130,000
Lead Scheduler
Lead Scheduler

Rider Levett Bucknall RLB • Milwaukee (WI)

On-site
USD 110,000 - 160,000
Scheduler V - Lead Scheduler
Scheduler V - Lead Scheduler

ENGICON CM • Los Angeles (CA)

On-site
USD 120,000 - 180,000
Project Scheduler
Project Scheduler

Smith Group of Americas • Dallas (TX)

On-site
USD 70,000 - 90,000
Construction Project Scheduler
Construction Project Scheduler

OnQCx • Boise (ID), Northern (KY)

Hybrid
USD 65,000 - 95,000
Health Insurance
Dental Insurance
Vision Insurance
+3
Scheduling Consultant (On-Site)
Scheduling Consultant (On-Site)

Ya-Group • Dallas (TX)

On-site
USD 95,000 - 140,000
Generous PTO
Career growth
Competitive salaries
+2
Project Controls Scheduler
Project Controls Scheduler

Jobtailor • Houston (TX)

On-site
USD 110,000 - 150,000