Fabrication Technician II — 2nd Shift, $1 Shift Diff

Eaton Corporation

Greenwood (SC)

On-site

USD 28,000 - 29,000

Full time

3 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Eaton Corporation’s ES AMER ARS division seeks a Fabrication Technician II - 2nd Shift at the Hodges, SC facility. Hours are 3:30 pm–11:30 pm, Monday–Friday. Base rate $20/hr plus $1/hr shift differential.

Eligible for variable incentive program. The role prepares busbars using presses, grinders, and taping equipment and may assist with material gathering. Responsibilities include maintaining 5S+ in the work area, data entry, SPC monitoring, and cross-training across fabrication areas.

Qualifications

  • High School Diploma or GED from an accredited institution.
  • Eaton will not sponsor visa or work authorization for this position.
  • No relocation benefit; within 50-mile radius of Hodges, SC.
  • 3 months of manufacturing experience in an industrial environment.
  • 3 months of fabrication experience.

Responsibilities

  • Operate manual presses, hand grinders, and taping equipment to prepare aluminum and copper busbars.
  • Gather materials for various work centers as needed.
  • Follow EHS guidelines and maintain 5S+ standards in the work area.
  • Enter information into the data collection system accurately and promptly.
  • Use calipers, gauges, and other tools to verify parts meet specs to ±0.001 in.
  • Perform routine machine maintenance and adjust clamps as needed.

Skills

Machine operation
Data entry
EHS compliance
Measurement accuracy

Education

High School Diploma or GED

Tools

Weidamatics equipment
Optishear
Band saws
Drill presses

Job description

Eaton Corporation’s ES AMER ARS division seeks a Fabrication Technician II - 2nd Shift at the Hodges, SC facility. Hours are 3:30 pm–11:30 pm, Monday–Friday. Base rate $20/hr plus $1/hr shift differential.

Eligible for variable incentive program. The role prepares busbars using presses, grinders, and taping equipment and may assist with material gathering. Responsibilities include maintaining 5S+ in the work area, data entry, SPC monitoring, and cross-training across fabrication areas.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

3rd Shift Fabrication Technician II – Elevate Your Craft
3rd Shift Fabrication Technician II – Elevate Your Craft

Eaton Group • Greenwood (SC)

On-site
USD 26,000 - 34,000
Fabrication Technician II - 2nd Shift (3:30–11:30 PM)
Fabrication Technician II - 2nd Shift (3:30–11:30 PM)

Eaton Group • Greenwood (SC)

On-site
USD 28,000 - 29,000
Variable incentive program
Fabrication Technician II - 2nd Shift
Fabrication Technician II - 2nd Shift

Eaton • Greenwood (SC)

On-site
USD 28,000 - 29,000
Electrical Assembly Technician II (2nd Shift)
Electrical Assembly Technician II (2nd Shift)

Eaton Group • Greenwood (SC)

On-site
USD 28,000 - 30,000
Assembly Technician - 1st Shift + Incentive Plan
Assembly Technician - 1st Shift + Incentive Plan

Eaton Group • Greenwood (SC)

On-site
USD 23,000 - 32,000
Fabrication Technician II (3rd Shift)
Fabrication Technician II (3rd Shift)

Eaton Group • Greenwood (SC)

On-site
USD 26,000 - 34,000
Fabrication Technician II - 2nd Shift
Fabrication Technician II - 2nd Shift

Eaton Group • Greenwood (SC)

On-site
USD 28,000 - 29,000
Variable incentive program
Electrical Technician II — 2nd Shift (IGX) $21/hr + Incentives
Electrical Technician II — 2nd Shift (IGX) $21/hr + Incentives

Eaton • Greenwood (SC)

On-site
USD 28,000 - 30,000
Shift differential
Variable incentive program
Advanced Assembly Technician II - 1st Shift
Advanced Assembly Technician II - 1st Shift

Eaton • South Carolina

On-site
USD 25,000 - 30,000
First-Shift LV Assembly Technician II – Growth & Impact
First-Shift LV Assembly Technician II – Growth & Impact

Eaton • Greenwood (SC)

On-site
USD 23,000 - 32,000
Variable incentive plan