Engineering Change Order Specialist

Applicantz, Inc

Fremont (CA)

On-site

USD 70,000 - 110,000

Full time

1 hour ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Applicantz, Inc. in Fremont, CA is seeking an on-site Documentation and Change Order specialist to manage COs from initiation to closure.

You will perform documentation research for parts/assemblies to ensure accuracy and adherence to change control policies while coordinating with engineers and designers. The role requires strong Excel skills (Pivot Tables, VLOOKUP) and the ability to multitask in a fast-paced environment.

Qualifications

  • Ability to operate efficiently in a fast-paced environment.
  • Strong understanding of change management and configuration management practices.
  • Ability to work overtime to support manufacturing needs and customer requests.
  • Strong attention to detail and commitment to quality.
  • Superior verbal and written communication skills.
  • Excellent organizational skills.
  • Demonstrated analytical abilities with attention to detail.
  • Self-motivated team player.
  • Ability to multitask and work under pressure.
  • Experience resolving scheduling conflicts with competing priorities.
  • Solid MS Office skills, especially Excel (Pivot Tables, VLOOKUP), MS Teams, PowerPoint, and Word.
  • iPLM/SAP experience (preferred).
  • Teamcenter and NX experience (preferred).

Responsibilities

  • Generates and manages Change Orders (CO) through closure.
  • Performs documentation research for all parts/assemblies included in the Engineering Change Order.
  • Supports NPI PMs on a daily basis for Engineering Change Order activities.
  • Interfaces with Engineers and Designers on BOM solutions that align with lean manufacturing.
  • Aligns key collaborators to drive solutions with cutin strategies, E&O, and effectivities.
  • POC for Change Control processes in Engineering.
  • Monitors and prioritizes tasks to ensure efficient change cut-in.
  • Processes part numbers, bills of materials, and change orders for change control board preparation.
  • Tracks documents from initiation to final approval.
  • Tracks and reports on document review progress.
  • Develops, tracks, and reports key metrics.
  • Generates and manages documentation in support of ISO standards, including revisions and releases.
  • Updates drawings from model changes.
  • Supports engineering and design on drawing and spec updates.
  • Facilitates Design review meetings and acts as a coordinator.
  • Captures decisions and action items and sends meeting minutes.

Skills

CAD Tools
PLM Systems
Communication skills
Attention to detail
Multitasking

Tools

NX
SolidWorks
Teamcenter
Enovia
SAP

Job description

This is a long-term onsite role in Fremont, CA 94538. Mon-Fri Regular shift.

ECS is a Documentation and Change Order (ECR/ECO) specialist responsible for the engineering change control process as part of PLM. Beyond generating and processing Change Orders, duties will include data mining, POC for change-related escalations, managing trackers, inter-department reports, and CIP activities in a high-paced environment.

Top Skills:
  • CAD Tools: NX, SolidWorks, or Creo
  • PLM Systems: Teamcenter, Enovia, Windchill, or Agile
Qualifications
  • Ability to operate efficiently and effectively in a fast-paced environment
  • Thorough understanding of change management and configuration management practices
  • Ability to work required overtime to support manufacturing needs and requests from our customers.
  • Strong attention to detail and uncompromising dedication to quality
  • Superior verbal and written communication skills
  • Exceptional organization skills
  • Demonstrated analytical abilities with strong attention to detail
  • Excellent follow-through
  • Must be driven and self-motivated, as well as a team player
  • Ability to multitask and work well under pressure
  • Experience in resolving scheduling conflicts and accommodating last-minute changes with competing priorities.
  • Solid Microsoft Office Suite skills, especially in Excel (Pivot Tables, Vlookup, Formatting, Graphing), also MS Teams, PowerPoint, and Word
  • iPLM/SAP experience (preferred)
  • Team center and NX Experience (preferred)
Responsibilities:
  • Generates and manages Change Orders (CO) through closure
  • Performs documentation research for all parts/assemblies to be included in the Engineering Change Order to ensure accuracy, completeness, and adherence to change control policies/procedures and design drafting standards. Makes decisions, provides recommendations, and/or escalates based on the needs of the situation
  • Supports NPI PMs (New Product Introduction Program Managers) on a daily basis for Engineering Change Order activities
  • Interfaces with Engineers and Designers on design solutions for BOMs that align with lean manufacturing requirements
  • Responsible for aligning key collaborators to drive solutions in alignment with cutin strategies, E&O, and effectivities
  • POC for Change Control processes in Engineering
  • Monitor and prioritize tasks to ensure efficient and timely change cut in
  • Process part numbers, bills of material, and change orders, which include preparation for the change control board, review for clarity, errors, proper approval routing, accuracy, and completeness
  • Track documents from initiation to final approval
  • Tracking and reporting on document review progress
  • Develop, track, and report key metrics
  • Generate and manage documentation in support of ISO standards, including revisions and releases
  • Update drawing from model changes
  • Support the engineering and design team on drawing and spec updates
  • Facilitate Design review meetings and act as a coordinator
  • Capture Key decisions, action items, and send detailed meeting minutes
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

PLM Documentation & Change Order Specialist
PLM Documentation & Change Order Specialist

Applicantz • Fremont (CA)

On-site
USD 90,000 - 120,000
Onsite Engineering Change Coordinator (ECO) PLM/NPI Support
Onsite Engineering Change Coordinator (ECO) PLM/NPI Support

Applicantz, Inc • Fremont (CA)

On-site
USD 70,000 - 110,000
Engineering Change Specialist
Engineering Change Specialist

Job Juncture • Farmington (CT)

On-site
USD 85,000 - 105,000
Engineering Change Specialist
Engineering Change Specialist

H.T. Prof Executive Search • Farmington (CT), Northern (KY)

Hybrid
USD 85,000 - 110,000
Engineering Change Specialist – PLM/NX CAD Expert
Engineering Change Specialist – PLM/NX CAD Expert

Apex Systems • Fremont (CA)

On-site
USD 48,000 - 61,000
Medical benefits
401(k) with company match
ESPP program
+2
ECR Change Coordinator
ECR Change Coordinator

Brose Sitech Group • Blythewood (SC)

On-site
USD 85,000 - 125,000
Stable employment
Professional development opportunities
Contract Analyst
Contract Analyst

JCW Group • Mountain View (CA)

On-site
USD 85,000 - 110,000
Engineering Analyst
Engineering Analyst

MacLean Power Systems • Alabaster (AL)

On-site
USD 70,000 - 90,000
Document Control Specialist
Document Control Specialist

Konnect Resources, LLC • Cypress (CA)

On-site
USD 34,357 - 51,522
Engineering Change Coordinator Intern (ERP & BOM)
Engineering Change Coordinator Intern (ERP & BOM)

Forensics Source • Jacksonville (FL)

Hybrid
USD 55,000 - 75,000