Engineering Change Order Specialist

Applicantz

Fremont (CA)

On-site

USD 90,000 - 130,000

Full time

2 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Applicantz is seeking an onsite Engineering Change Coordinator in Fremont, CA to manage COs and ensure accurate documentation per change control policies. You will coordinate with engineers and designers on BOM alignment, support NPI activities, and monitor change cut-in timelines in a fast-paced environment.

Proficiency with CAD tools (NX/SolidWorks/Creo) and PLM systems (Teamcenter/Enovia/Windchill/Agile) is desired, with strong Excel and MS Office skills. This is a long-term onsite role."

Qualifications

  • Ability to operate efficiently in a fast-paced environment.
  • Thorough understanding of change management and configuration management practices.
  • Willingness to work required overtime to support manufacturing needs.

Responsibilities

  • Generates and manages Change Orders through closure.
  • Performs documentation research for parts/assemblies for ECOs.
  • Supports NPI PMs on Engineering Change Order activities.
  • Interfaces with Engineers and Designers on BOM solutions.
  • Track documents from initiation to final approval.
  • Develops, tracks, and reports key metrics.

Skills

NX
SolidWorks
Creo
Teamcenter
Enovia
Windchill
Agile

Tools

SAP

Job description

This is a long-term onsite role in Fremont, CA 94538. Mon-Fri Regular shift.

ECS is a Documentation and Change Order (ECR/ECO) specialist responsible for the engineering change control process as part of PLM. Beyond generating and processing Change Orders, duties will include data mining, POC for change-related escalations, managing trackers, inter-department reports, and CIP activities in a high-paced environment.

Top Skills:
  • CAD Tools: NX, SolidWorks, or Creo
  • PLM Systems: Teamcenter, Enovia, Windchill, or Agile
Qualifications
  • Ability to operate efficiently and effectively in a fast-paced environment
  • Thorough understanding of change management and configuration management practices
  • Ability to work required overtime to support manufacturing needs and requests from our customers.
  • Strong attention to detail and uncompromising dedication to quality
  • Superior verbal and written communication skills
  • Exceptional organization skills
  • Demonstrated analytical abilities with strong attention to detail
  • Excellent follow-through
  • Must be driven and self-motivated, as well as a team player
  • Ability to multitask and work well under pressure
  • Experience in resolving scheduling conflicts and accommodating last-minute changes with competing priorities.
  • Solid Microsoft Office Suite skills, especially in Excel (Pivot Tables, Vlookup, Formatting, Graphing), also MS Teams, PowerPoint, and Word
  • iPLM/SAP experience (preferred)
  • Team center and NX Experience (preferred)
Responsibilities:
  • Generates and manages Change Orders (CO) through closure
  • Performs documentation research for all parts/assemblies to be included in the Engineering Change Order to ensure accuracy, completeness, and adherence to change control policies/procedures and design drafting standards. Makes decisions, provides recommendations, and/or escalates based on the needs of the situation
  • Supports NPI PMs (New Product Introduction Program Managers) on a daily basis for Engineering Change Order activities
  • Interfaces with Engineers and Designers on design solutions for BOMs that align with lean manufacturing requirements
  • Responsible for aligning key collaborators to drive solutions in alignment with cutin strategies, E&O, and effectivities
  • POC for Change Control processes in Engineering
  • Monitor and prioritize tasks to ensure efficient and timely change cut in
  • Process part numbers, bills of material, and change orders, which include preparation for the change control board, review for clarity, errors, proper approval routing, accuracy, and completeness
  • Track documents from initiation to final approval
  • Tracking and reporting on document review progress
  • Develop, track, and report key metrics
  • Generate and manage documentation in support of ISO standards, including revisions and releases
  • Update drawing from model changes
  • Support the engineering and design team on drawing and spec updates
  • Facilitate Design review meetings and act as a coordinator
  • Capture Key decisions, action items, and send detailed meeting minutes
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Engineering Change Order Specialist
Engineering Change Order Specialist

Applicantz • Fremont (CA)

On-site
USD 70,000 - 95,000
PLM Documentation & Change Order Specialist
PLM Documentation & Change Order Specialist

Applicantz • Fremont (CA)

On-site
USD 90,000 - 120,000
Engineering Change Services
Engineering Change Services

Ryzen Solutions • Fremont (CA)

On-site
USD 48,000 - 63,000
Health, dental, and vision insurance
401(k) with company match
Professional development opportunities
+1
Engineering Change Specialist
Engineering Change Specialist

Job Juncture • Farmington (CT)

On-site
USD 85,000 - 105,000
Engineering Change Specialist
Engineering Change Specialist

H.T. Prof Executive Search • Farmington (CT)

On-site
USD 85,000 - 110,000
Engineering Change Specialist – PLM/NX CAD Expert
Engineering Change Specialist – PLM/NX CAD Expert

Apex Systems • Fremont (CA)

On-site
USD 48,000 - 61,000
Medical benefits
401(k) with company match
ESPP program
+2
CO & NPI Engineering Change Lead (Onsite Fremont)
CO & NPI Engineering Change Lead (Onsite Fremont)

Applicantz • Fremont (CA)

On-site
USD 90,000 - 130,000
Document Control Specialist
Document Control Specialist

Konnect Resources, LLC • Cypress (CA)

Hybrid
USD 34,357 - 51,522
Onsite Change Order Specialist - PLM & CAD
Onsite Change Order Specialist - PLM & CAD

Applicantz, Inc • Fremont (CA)

On-site
USD 70,000 - 95,000
ECN Orchestrator: Cross-Functional Change Leader
ECN Orchestrator: Cross-Functional Change Leader

H.T. Prof Executive Search • Farmington (CT)

Hybrid
USD 85,000 - 110,000