EMS Lab Instructor - Part-Time Impact & Training

Georgia Power Company

United States

A distancia

USD 23.000 - 32.000

A tiempo parcial

Hace 7 días
Sé de los primeros/as/es en solicitar esta vacante

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Descripción de la vacante

West Georgia Technical College seeks a part-time EMS Lab Assistant to support instructors by supervising students, evaluating progress, and maintaining lab safety and supplies for classroom and lab activities. The role includes a blend of face-to-face and hybrid instruction as needed.

The position is seasonal with Monday–Friday day/evening hours, potential travel to other campuses, and an hourly rate of $20.

Formación

  • Must hold National Registry Advanced EMT or Paramedic license for 2+ consecutive years.
  • Valid Driver’s License.
  • Bachelor’s degree from an accredited institution is preferred.

Responsabilidades

  • Assist Program Director and lead instructor in supervising and evaluating students in classroom and lab settings.
  • Maintain safe lab environment, ensure equipment and supplies are stocked and properly documented.
  • Collaborate with faculty to measure and improve student learning outcomes.
  • Prepare and maintain documentation and administrative reports as required.

Conocimientos

Lab supervision
Safety compliance
Oral & written communication
Student assessment
Team collaboration

Educación

NREMT Advanced EMT or Paramedic license
Driver's License
Bachelor’s degree (preferred)

Descripción del empleo

West Georgia Technical College seeks a part-time EMS Lab Assistant to support instructors by supervising students, evaluating progress, and maintaining lab safety and supplies for classroom and lab activities. The role includes a blend of face-to-face and hybrid instruction as needed.

The position is seasonal with Monday–Friday day/evening hours, potential travel to other campuses, and an hourly rate of $20.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

EMS Lab Instructor (Part-Time)
EMS Lab Instructor (Part-Time)

Georgia Department of Revenue • Lawrenceville (GA)

Presencial
USD 18.000 - 25.000
EMS Laboratory Instructor (Part-Time EMT Educator)
EMS Laboratory Instructor (Part-Time EMT Educator)

State of Georgia • Lawrenceville (GA)

Presencial
USD 34.000 - 49.000
EMS Lab Assistant - Part-Time Paramedic Training
EMS Lab Assistant - Part-Time Paramedic Training

State of Georgia • EE. UU.

Presencial
USD 19.000 - 25.000
Part-Time EMS Lab Instructor & Paramedic Educator
Part-Time EMS Lab Instructor & Paramedic Educator

State of Georgia • EE. UU.

Presencial
USD 39.000 - 44.000
Paramedic Lab Instructor — Part-Time
Paramedic Lab Instructor — Part-Time

State of Georgia • EE. UU.

Presencial
USD 34.000 - 49.000
EMS Program Lead & Part-Time Clinical Instructor
EMS Program Lead & Part-Time Clinical Instructor

Georgia Department of Revenue • Acworth (GA)

Presencial
USD 43.000 - 62.000
Part-Time EMS Skills Instructor — Hands-On Lab Mentor
Part-Time EMS Skills Instructor — Hands-On Lab Mentor

Grayson College • Denison (TX)

Presencial
USD 41.000 - 55.000
Paramedic Education Instructor - Part-Time
Paramedic Education Instructor - Part-Time

State of Georgia • Lawrenceville (GA)

Presencial
USD 29.000 - 36.000
EMS Lab & Clinical Technician (Part-Time)
EMS Lab & Clinical Technician (Part-Time)

Tennessee Board of Regents • Memphis (TN)

Presencial
USD 21.000 - 30.000
EMS Lab Assistant PS/PS
EMS Lab Assistant PS/PS

Georgia Power Company • EE. UU.

A distancia
USD 23.000 - 32.000