Earned Value & Cost Control Analyst

Talentify

El Segundo (CA)

On-site

USD 76,000 - 114,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

9/80 schedule
401K matching
Health insurance

Job summary

Northrop Grumman Aeronautics Sector seeks a Level 2 Program Control Analyst to be on-site in El Segundo, CA. The role supports EVMS-compliant cost control across programs, including setup, monitoring, and reporting of cost and schedule baselines.

Requirements include a bachelor’s degree with 2 years of relevant experience (or a master’s), and proficiency with Microsoft Office. Preferred candidates hold an active DoD Secret Clearance and knowledge of COBRA, COGNOS, SAP, and EVM.

Qualifications

  • Bachelor’s degree with 2 years of relevant, professional experience, or Master’s degree of relevant, professional experience.
  • Proficiency with Microsoft Office Suite; Excel, Word, PowerPoint.
  • Active DoD Secret Clearance (preferred).

Responsibilities

  • Set up cost control system, monitors and controls costs and schedules on Contracts requiring validated cost schedule control system
  • Maintain Earned Value Management System (EVMS) compliance including cost/schedule integration
  • Perform analyses and prepares reports to ensure that contracts are within negotiated and agreed-upon parameters and government cost control guidelines
  • Prepare and maintain spend plans; develop and review Estimates at Complete (EACs); incorporate changes into the EVMS system to maintain cost and schedule baselines
  • Financial CDRL deliverables
  • Assist CAMs with EVMS activities including WBS development and alignment; time-phasing of tasks; developing and documenting earned value methodologies; performance measurement; estimate to complete analysis and updates and variance analysis research and reporting
  • Create financial charts in support of program management and program reviews; identify cost impacts and develop recovery plans as required
  • Responsible for actuals reconciliation, budget change requests and ensuring proper accounting
  • Incorporate contractual changes into control systems by staying aware of outstanding work against each contract to maintain realistic contract cost and schedule baselines.

Skills

Microsoft Office Suite
Analytical skills

Education

Bachelor's degree with 2 years of relevant experience, or Master’s degree

Tools

COBRA
COGNOS
SAP
EVM

Job description

Northrop Grumman Aeronautics Sector seeks a Level 2 Program Control Analyst to be on-site in El Segundo, CA. The role supports EVMS-compliant cost control across programs, including setup, monitoring, and reporting of cost and schedule baselines.

Requirements include a bachelor’s degree with 2 years of relevant experience (or a master’s), and proficiency with Microsoft Office. Preferred candidates hold an active DoD Secret Clearance and knowledge of COBRA, COGNOS, SAP, and EVM.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Earned Value & Cost Schedule Control Analyst
Earned Value & Cost Schedule Control Analyst

Northrop Grumman Corp. (JP) • San Diego (CA)

Hybrid
USD 76,000 - 114,000
EVMS Cost & Schedule Control Analyst
EVMS Cost & Schedule Control Analyst

Talentify • Redondo Beach (CA)

On-site
USD 76,000 - 114,000
Health insurance
9/80 schedule
401K matching
Earned Value & Program Cost Control Analyst
Earned Value & Program Cost Control Analyst

Northrop Grumman • San Diego (CA)

On-site
USD 76,000 - 114,000
Relocation assistance
Health insurance
Life insurance
+4
Strategic Cost & Earned Value Analyst
Strategic Cost & Earned Value Analyst

0090 CORP-Corporate Office • United States

On-site
USD 75,800 - 113,800
Strategic EVMS & Program Cost Analyst
Strategic EVMS & Program Cost Analyst

Talentify • Layton (UT)

On-site
USD 66,000 - 114,000
Flexible work arrangements
Excellent benefits
9/80 schedule
+1
Senior EVMS & Cost/Schedule Control Analyst
Senior EVMS & Cost/Schedule Control Analyst

Talentify • El Segundo (CA)

On-site
USD 94,000 - 141,000
Relocation assistance
On-site work
Earned Value & Cost Control Analyst
Earned Value & Cost Control Analyst

Northrop Grumman Corp. • Virginia (MN)

On-site
USD 76,000 - 141,000
Lead Program Cost Schedule Control Analyst (EVMS)
Lead Program Cost Schedule Control Analyst (EVMS)

Northrop Grumman Corp. • Palmdale (CA)

On-site
USD 81,000 - 141,000
9/80 schedule
401K matching
Health insurance
Earned Value & Cost Control Analyst (Level 2)
Earned Value & Cost Control Analyst (Level 2)

Talentify • San Diego (CA)

On-site
USD 76,000 - 114,000
Flexible work arrangements
Excellent healthcare
9/80 schedule
+1
Strategic Program Cost & Schedule Analyst
Strategic Program Cost & Schedule Analyst

Northrop Grumman Corp. • El Segundo (CA)

On-site
USD 76,000 - 114,000
Health insurance
Life and disability insurance
Savings plan
+1