Construction Scheduler - Remote, P6 & Critical Path

Sccsinternational

Los Angeles, Northern (CA, KY)

Hybrid

USD 100.000 - 250.000

Vollzeit

vor 37 Stunden
Sei unter den ersten Bewerbenden
Bewerbungsgenerator

Eine vollständige Bewerbung in einer Minute — maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.

Schaffe es an den ATS-Filtern vorbei

Zusammenfassung

J.S. Held in Los Angeles is seeking a Scheduler to develop and maintain project programmes using Primavera P6, MS Project, or similar software.

You will sequence tasks, allocate resources, and identify dependencies, durations, and critical path elements to produce realistic timelines. Progress is tracked against the programme using field data and change orders; you will work with PMs, engineers, and subcontractors to gather inputs, manage risks, and prepare contingency plans.

Qualifikationen

  • Bachelor's degree in construction management, engineering or related field
  • Associates degree with relevant experience may be considered
  • Proficiency in Primavera P6 and other scheduling software (e.g., MS Project)
  • Knowledge of CPM and earned value management
  • Ability to read and interpret construction drawings and specs
  • Understanding of construction workflows, permitting and inspection timelines
  • Willingness to travel

Aufgaben

  • Develop and maintain project programmes; sequence tasks and allocate resources
  • Identify dependencies, durations, and critical path elements
  • Monitor progress against the programme using field data and change orders
  • Prepare contingency plans and mitigate delays; manage risks
  • Support claims analysis and recovery planning
  • Report on progress, variance, and mitigation to stakeholders

Kenntnisse

Scheduling software
Critical Path Method
Earned Value Management
Read construction drawings

Ausbildung

Bachelor's degree in construction management/engineering or related field
Associate's degree with relevant experience

Tools

Primavera P6
Microsoft Project

Jobbeschreibung

J.S. Held in Los Angeles is seeking a Scheduler to develop and maintain project programmes using Primavera P6, MS Project, or similar software.

You will sequence tasks, allocate resources, and identify dependencies, durations, and critical path elements to produce realistic timelines. Progress is tracked against the programme using field data and change orders; you will work with PMs, engineers, and subcontractors to gather inputs, manage risks, and prepare contingency plans.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Remote Construction Scheduler & CPM Expert
Remote Construction Scheduler & CPM Expert

J.S. Held LLC • Los Angeles (CA)

Hybrid
USD 100.000 - 250.000
Remote work option
Flexible Time Off
Medical/Dental/Vision Insurance
+1
Scheduler, Construction Advisory
Scheduler, Construction Advisory

Sccsinternational • Los Angeles (CA), Northern (KY)

Hybrid
USD 100.000 - 250.000
Senior Project Controls Scheduler — Hybrid-Remote (P6 Pro)
Senior Project Controls Scheduler — Hybrid-Remote (P6 Pro)

PM2CM, Inc. • Pomona (CA)

Hybrid
USD 110.000 - 160.000
Health insurance
401k
Profit sharing
Construction Scheduler | P6 Expert | Lead & Mentor
Construction Scheduler | P6 Expert | Lead & Mentor

Arcadis • Los Angeles (CA), Northern (KY)

Hybrid
USD 135.000 - 165.000
Project Scheduler - P6/MS Project, Construction Lead
Project Scheduler - P6/MS Project, Construction Lead

Fres-co System USA, Inc. • El Segundo (CA)

Vor Ort
USD 100.000 - 130.000
100% ESOP
Competitive Pay
Bonus Program
+5
Construction Scheduler – P6, EVA & Schedule Analytics
Construction Scheduler – P6, EVA & Schedule Analytics

DESTINATION ENTERPRISES INC • Los Angeles (CA)

Vor Ort
USD 90.000 - 120.000
401(k)
Dental insurance
Health insurance
+1
Construction Scheduler - P6/MS Project Expert for Public Projects
Construction Scheduler - P6/MS Project Expert for Public Projects

Internetwork Expert • Los Angeles (CA)

Vor Ort
USD 80.000 - 120.000
Junior Scheduler: Master P6 & Critical Path Analytics
Junior Scheduler: Master P6 & Critical Path Analytics

O2EPCM, Inc. dba O2 Engineering, Projects & Construction Management • Los Angeles (CA)

Vor Ort
USD 60.000 - 80.000
Senior Project Scheduler - P6 Expert for Capital Projects
Senior Project Scheduler - P6 Expert for Capital Projects

Cordoba-Corporation • Los Angeles (CA)

Vor Ort
USD 175.000 - 200.000
Medical insurance
Dental insurance
Vision insurance
+3
Senior Scheduler — Data Center Projects (Remote)
Senior Scheduler — Data Center Projects (Remote)

Jones Lang LaSalle Incorporated • Town of Texas (WI)

Hybrid
USD 139.000 - 201.000
401(k) plan with matching
Medical, Dental & Vision
Paid parental leave
+2