Remote Construction Scheduler & CPM Expert

J.S. Held LLC

Los Angeles (CA)

Hybrid

USD 100,000 - 250,000

Full time

11 days ago

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Remote work option
Flexible Time Off
Medical/Dental/Vision Insurance
401k Match

Job summary

J.S. Held LLC in Los Angeles, CA, is seeking a Project Scheduler to join its growing, high-energy team. You will develop and maintain project schedules, coordinate with PMs, engineers, and subcontractors, and ensure alignment with project objectives.

The role requires proficiency in Primavera P6 or MS Project, familiarity with CPM and EV, and the ability to read drawings. Travel may be required; remote work is available as needed, with a generous benefits package.

Qualifications

  • Bachelor’s degree in construction management or engineering is required.
  • Experience with CPM and Earned Value Management.
  • Ability to read and interpret construction drawings and specifications.
  • Understanding of construction workflows, permitting, and inspection timelines.

Responsibilities

  • Develop and maintain project schedules using Primavera P6, Microsoft Project, or similar scheduling software.
  • Sequence tasks, allocate resources, identifying dependencies, durations, and critical path elements to create realistic timelines.
  • Monitor progress and update the schedule based on field data, change orders, or delays.
  • Coordinate with project managers, engineers, and subcontractors to gather schedule inputs and align with project objectives.
  • Identify risks and develop contingency plans for delays, resource shortages, or weather impacts.
  • Generate and distribute schedule reports to stakeholders, including progress updates, variance analysis, and mitigation strategies.
  • Support claims analysis and recovery planning when delays occur, ensuring compliance with scheduling requirements.
  • Collaborate with procurement and staffing to ensure timely availability of materials and labor.

Skills

CPM understanding
Earned Value Management
Reading drawings
Construction workflows

Education

Bachelor’s degree in construction management or engineering
Associate’s degree with relevant experience

Tools

Primavera P6
Microsoft Project

Job description

J.S. Held LLC in Los Angeles, CA, is seeking a Project Scheduler to join its growing, high-energy team. You will develop and maintain project schedules, coordinate with PMs, engineers, and subcontractors, and ensure alignment with project objectives.

The role requires proficiency in Primavera P6 or MS Project, familiarity with CPM and EV, and the ability to read drawings. Travel may be required; remote work is available as needed, with a generous benefits package.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Remote Part-Time Construction Scheduler (Primavera P6)
Remote Part-Time Construction Scheduler (Primavera P6)

Overall Consulting • Sacramento (CA)

On-site
Flexible part-time schedule
Fully remote within California
Opportunity to transition to full-time
Scheduler - Construction Advisory
Scheduler - Construction Advisory

J.S. Held LLC • Los Angeles (CA)

Hybrid
USD 100,000 - 250,000
Remote work option
Flexible Time Off
Medical/Dental/Vision Insurance
+1
Remote Senior Scheduler: Primavera P6 & CPM Expert
Remote Senior Scheduler: Primavera P6 & CPM Expert

Hill International, Inc. • San Antonio (TX)

On-site
USD 95,000 - 130,000
Medical Insurance
Dental Insurance
Vision Insurance
+2
Senior Project Scheduler — Primavera P6 (On-Site LA)
Senior Project Scheduler — Primavera P6 (On-Site LA)

CMTS LLC • Los Angeles (CA)

On-site
USD 184,000 - 195,000
Company-paid health/dental/vision
401k + life insurance
Career development opportunities
Lead Scheduler - Capital Construction, Los Angeles
Lead Scheduler - Capital Construction, Los Angeles

PMCS Group, Inc. • Los Angeles (CA)

On-site
USD 183,000 - 194,000
PTO: 120 hours annual
Holidays: 8 paid holidays
Insurance: Medical, Dental, Vision
+3
Onsite Construction Scheduler (Primavera P6) in LA
Onsite Construction Scheduler (Primavera P6) in LA

PMCS Group, Inc. • Los Angeles (CA)

On-site
USD 171,000 - 191,000
PTO: 120 hours annually
8 paid holidays per year
Medical, Dental, Vision insurance
+3
Lead Scheduler
Lead Scheduler

Simpson & Simpson Management Consulting • Los Angeles (CA)

On-site
USD 180,000 - 260,000
Senior Project Scheduler – EPC Energy Infrastructure (P6)
Senior Project Scheduler – EPC Energy Infrastructure (P6)

Primoris Services Corp. • Los Angeles (CA)

On-site
USD 120,000 - 160,000
401k w/employer match
Health/Dental/Vision insurance plans
Paid time off
+2
Senior Construction Scheduler - CPM & Primavera Pro
Senior Construction Scheduler - CPM & Primavera Pro

STO Building Group • Los Angeles (CA)

On-site
USD 150,000 - 180,000
Medical Insurance
Dental Insurance
Vision Insurance
+2
Project Scheduler - Location: Los Angeles CA
Project Scheduler - Location: Los Angeles CA

PMCS Group, Inc. • Los Angeles (CA)

On-site
USD 166,000 - 181,000