Construction Delay & Quantum Analyst

Secretariat

Los Angeles (CA)

In loco

USD 85.000 - 95.000

Tempo pieno

6 giorni fa
Candidati tra i primi

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro

Il tuo curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Descrizione del lavoro

Secretariat is seeking a skilled professional to join our Construction Quantum team in Los Angeles. The role focuses on researching and analyzing large construction datasets, quantifying damages, and drafting expert reports for disputes and arbitrations.

You will work with engineers, economists and forensic teams to deliver precise monetary conclusions. Candidates should have an engineering/construction background, strong Excel skills, and the ability to communicate complex findings clearly.

Competenze

  • Degree level education in Engineering, Construction or Quantity Surveying related field, Master’s degree and/or Professional Engineer’s license preferred but not required.
  • Ideally at least 1 year of relevant engineering, construction, or project management related industry experience (but not required)
  • Experience in writing or contributing to Quantum Expert (or technical) reports (or desire to learn)
  • Familiarity with construction cost management
  • Broad experience across a range of construction/engineering projects
  • Proficient with Microsoft Excel and comfortable with large sets of data
  • Able to adapt to a dynamic consultancy environment.
  • Able to develop creative approaches and solutions necessary to resolve complex problems
  • Able to meet tight deadlines and work under pressure
  • Excellent communication and presentation skills
  • Willing to occasionally travel within the US and/or internationally
  • Must be authorized to work in the US without the need for sponsorship in the future

Mansioni

  • Research and fact-finding
  • Reviewing technical and non-technical documentation (change orders, blueprints and technical engineering drawing, reports, cost estimates, correspondence, market data, financial data, etc.…) to identify key details and metrics used to develop expert reports.
  • Through research, develop keen understanding of all relevant information pertaining to legal disputes regarding largescale construction projects
  • Detailed data analysis
  • Review large datasets using multiple analytical methods and tools to identify tends, anomalies, and other details which may have led to cost and schedule overruns
  • Quantification of cost overruns and damages
  • Knowledge of project job costs and controls (or desire to learn)
  • Apply analytical methods to large datasets to calculate damages and cost overruns in largescale construction projects
  • Assist in drafting expert reports, converting technical data into a narrative to be submitted to appropriate court venues
  • Economic modeling
  • Analyzing financial data and market data to determine lost profits due to schedule delays and cost overruns.
  • Assist colleagues and executives in identifying the best approach to individual litigation/arbitration matters to assist clients in attaining a desired legal decision
  • Supporting world-renowned Quantum experts in dispute resolution, litigation support and expert witness testimony

Conoscenze

Excellent communication
Ability to meet tight deadlines
Strong analytical skills
Willing to travel

Formazione

Degree in Engineering/Construction/Quantity Surveying

Strumenti

Microsoft Excel

Descrizione del lavoro

Secretariat is seeking a skilled professional to join our Construction Quantum team in Los Angeles. The role focuses on researching and analyzing large construction datasets, quantifying damages, and drafting expert reports for disputes and arbitrations.

You will work with engineers, economists and forensic teams to deliver precise monetary conclusions. Candidates should have an engineering/construction background, strong Excel skills, and the ability to communicate complex findings clearly.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Construction Delay & Quantum Analyst — Forensic Expert
Construction Delay & Quantum Analyst — Forensic Expert

Secretariat Advisors LLC • Los Angeles (CA)

In loco
USD 85.000 - 95.000
Construction Delay Analyst (1–4 yrs)
Construction Delay Analyst (1–4 yrs)

Secretariat • Washington

In loco
USD 80.000 - 98.000
Quantum, Construction Advisory
Quantum, Construction Advisory

Sccsinternational • Los Angeles (CA), Northern (KY)

Ibrido
USD 100.000 - 260.000
Construction Delay Analysis Intern
Construction Delay Analysis Intern

Secretariat • Los Angeles (CA)

In loco
USD 39.000 - 44.000
Pay transparency
Senior Associate Director, Quantum & Forensic Analysis
Senior Associate Director, Quantum & Forensic Analysis

J.S. Held LLC • Chicago (IL)

Ibrido
USD 140.000 - 175.000
Remote work flexibility
Flexible Time Off
Medical, Dental, and Vision Insurance
+1
Construction Delay Senior Associate: Expert Scheduling
Construction Delay Senior Associate: Expert Scheduling

Secretariat • Atlanta (GA)

In loco
USD 70.000 - 110.000
Senior Quantum & Delay Consultant — Remote
Senior Quantum & Delay Consultant — Remote

Rimkus • Stati Uniti

Remoto
USD 120.000 - 180.000
Private Healthcare Plan
Pension Plans
Life Assurance
+4
Senior Consultant, Quantum & Delay Analysis (Remote)
Senior Consultant, Quantum & Delay Analysis (Remote)

Rimkus Consulting Group • Stati Uniti

Remoto
USD 110.000 - 170.000
Healthcare
Pension
Life Insurance
+4
Associate Director, Quantum & Forensic Analysis
Associate Director, Quantum & Forensic Analysis

J.S. Held LLC • Chicago (IL)

Ibrido
USD 140.000 - 175.000
Remote work flexibility
Flexible Time Off
Medical, Dental, and Vision Insurance
+1
Construction Delay Analyst – Entry Level
Construction Delay Analyst – Entry Level

Secretariat • Atlanta (GA)

In loco
USD 42.000 - 54.000