A complete application in a minute
Tailored resume and cover letter, ready to send.
Hoar Construction is seeking a VDC Manager to lead on-site VDC processes across multiple projects, advancing BIM-driven design and preconstruction accuracy. You will develop and implement BIM strategies, coordinate with field teams, and support targeted value design initiatives.
The role requires 5–7 years in VDC/BIM, proficiency with VICO, Navisworks, Revit, Assemble, and a drive to integrate BIM solutions with project scheduling and cost control. Travel up to 10% is expected.
Hoar Construction is seeking a VDC Manager to lead on-site VDC processes across multiple projects, advancing BIM-driven design and preconstruction accuracy. You will develop and implement BIM strategies, coordinate with field teams, and support targeted value design initiatives.
The role requires 5–7 years in VDC/BIM, proficiency with VICO, Navisworks, Revit, Assemble, and a drive to integrate BIM solutions with project scheduling and cost control. Travel up to 10% is expected.