Advanced Construction Scheduler - P6 & Earned Value Analyst

Element Consulting Inc.

Los Angeles (CA)

On-site

USD 126,000 - 146,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Element Consulting, Inc. seeks a senior scheduler to review and manage P6 baseline and monthly schedules for LAUSD projects. You will identify missing scope, analyze critical paths, and validate cost loading against LAUSD templates.

You will create filters, layouts, and charts to support management in analyzing construction schedules. The role requires 3+ years of relevant scheduling experience, strong communication, and the ability to interpret plans and specifications for school construction

Qualifications

  • Three years of full-time professional scheduling experience, preferably on educational facilities or public works projects.
  • Excellent written and verbal communication skills.
  • Ability to read and interpret architectural plans, drawings and contracts.
  • Strong organizational and planning abilities.

Responsibilities

  • Review Contractor P6 initial Baseline Construction Schedules and identify missing scope, logic or milestones; identify and analyze the critical path; review cost loading and provide comments per LAUSD templates.
  • Review monthly Contractor P6 schedule updates and document milestone and critical path slippage; provide overall schedule analysis per LAUSD templates.
  • Create activity schedule filters, layouts, and bar-charts using P6 Primavera to analyze critical path issues.
  • Perform QA/QC on contractor submittals for conformance with contract scope and scheduling guidelines.
  • Ensure proper use of program codes, layouts and reports to maintain data integrity.
  • Create Earned Value Curves based on LAUSD EVA template guidelines.
  • Prepare reports and assist scheduling management in project reporting.

Job description

  • Review Contractor P6 initial Baseline Construction Schedules and identify missing scope, logic or milestones; identify and analyze the critical path; review the required cost loading and provide written technical schedule review comments based on LAUSD’s structured review templates
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates
  • Create various activity schedule filters, layouts, and bar-charts utilizing P6 Primavera Schedule Software to assist the project management team in analyzing critical path construction schedule issues
  • Perform QA/QC on contractor’s schedule submittals for conformance with contract scope and terms for projects; P6 program schedules and validate logic ties to ensure conformance with scheduling guidelines for various project types
  • Ensure proper use of program-level standard codes, layouts and reports necessary to ensure data integrity
  • Create Earned Value Curves based on LAUSD EVA template guidelines
  • Prepare reports as needed and assist scheduling management in reporting projects as necessary

Minimum Requirements

  • Three (3) years full time paid professional experience responsible in Scheduling for an Owner or General Contractor, preferably on multiple educational facilities or public works projects or scheduling for various projects in a program

Duties:

  • Review Contractor P6 initial Baseline Construction Schedules and identify missing scope, logic or milestones; identify and analyze the critical path; review the required cost loading and provide written technical schedule review comments based on LAUSD’s structured review templates
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates
  • Create various activity schedule filters, layouts, and bar-charts utilizing P6 Primavera Schedule Software to assist the project management team in analyzing critical path construction schedule issues
  • Perform QA/QC on contractor’s schedule submittals for conformance with contract scope and terms for projects; P6 program schedules and validate logic ties to ensure conformance with scheduling guidelines for various project types
  • Ensure proper use of program-level standard codes, layouts and reports necessary to ensure data integrity
  • Create Earned Value Curves based on LAUSD EVA template guidelines
  • Prepare reports as needed and assist scheduling management in reporting projects as necessary

Minimum Requirements

Required Experience:

  • Three (3) years full time paid professional experience responsible in Scheduling for an Owner or General Contractor, preferably on multiple educational facilities or public works projects or scheduling for various projects in a program

Required Skills:

  • Proficiency in Primavera Latest Version and MS Office Suite
  • Ability to read and interpret architectural plans, drawings and contract specifications to earn insight into the required scope of work for multiple school construction projects
  • Excellent written and verbal communication skills
  • Ability to build efficient working relationships with project teams and department staff
  • Superior organizational and planning skills

Required Education:

  • Graduation from a recognized college or university with a bachelor’s degree in architecture, engineering, construction management, construction engineering or any related field

Salary dependent on education and experience. Salary range: $126K-146K

Why Choose Element Consulting?

Element Consulting is a construction management company dedicated to providing clients with responsible and innovative solutions to their project needs, from inception to completion. Based out of El Segundo, CA, the firm offers program, project, and construction management services. We invite you to join us in 'Bringing the Right Elements Together for Our Clients' Success.'

Powered by JazzHR

TiBZOtSOX1
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Associate Scheduler
Associate Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 126,000 - 146,000
Project Scheduler
Project Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 155,000 - 175,000
Project Scheduler
Project Scheduler

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 155,000 - 175,000
Junior Scheduler
Junior Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 110,000 - 130,000
Junior Scheduler
Junior Scheduler

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 110,000 - 130,000
Senior Regional Construction Scheduler in Los Angeles
Senior Regional Construction Scheduler in Los Angeles

Energy Jobline ZR • Los Angeles (CA)

On-site
USD 170,000 - 190,000
P6 Scheduler for Public Works & Education Projects
P6 Scheduler for Public Works & Education Projects

Pacifica Services, Inc. • Los Angeles (CA)

On-site
USD 95,000 - 135,000
Project Scheduler III
Project Scheduler III

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 150,000 - 170,000
Associate Scheduler
Associate Scheduler

O2EPCM, Inc. dba O2 Engineering, Projects & Construction Management • Los Angeles (CA)

On-site
USD 123,000 - 131,000
Full W2 benefits
No per diem
No relocation packages
Associate Scheduler
Associate Scheduler

Pacifica Services, Inc. • Los Angeles (CA)

On-site
USD 95,000 - 135,000