Senior Regional Construction Scheduler in Los Angeles

Energy Jobline ZR

Los Angeles (CA)

On-site

USD 170,000 - 190,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Element Consulting is a construction management company based in El Segundo, CA, seeking a seasoned Construction Scheduler with a strong owner/GC background. The role focuses on CPM scheduling, baselines, updates, and schedule risk analysis to support education/public works projects.

You will read complex drawings, manage the project schedule with teams, and produce written reviews in line with LAUSD templates. The position is on-site with a competitive salary and growth opportunities.

Qualifications

  • Ten years of full-time experience in construction scheduling.
  • Proficiency in Primavera P6 (P6 v19) and MS Office Suite.

Responsibilities

  • Report to the Senior Construction Manager of Scheduling and Estimating and prepare schedule reports for upper management.
  • Supervise project schedulers and interface with senior project managers and site staff on CPM schedules.
  • Read drawings to understand work scope and verify in/out of scope for time extensions.
  • Review contractor P6 baselines and monthly updates, identify gaps, critical path, and provide written comments.
  • Perform schedule time impact analysis using Windows Analysis and forensic parameters, with detailed write-ups.
  • Communicate schedule/progress issues at regular meetings and update program/master schedules.
  • Ensure data integrity with standard codes, layouts, and reports; prepare management-directed reports.
  • Visit construction sites and review contractor monthly schedule progress.

Skills

Communication skills
Organizational planning
Relationship building
Cost engineering basics

Education

Bachelors in engineering/architecture/construction management
Bachelor's degree + 4 years experience alternative

Tools

Primavera P6 (P6 v19)
MS Office

Job description

Job DescriptionJob Description
Minimum Requirements
Required Experience:
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite.
Required Education:
  • Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four(4) years of experience in the duties above to compensate for the required education.
Required Skills:
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics.
Duties:
  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required costloading, and be able to provide written technical schedule review comments based on LAUSD’sstructured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of thecontract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.

Salary dependent on education and experience. Salary range: $170K-$190K.

Why Choose Element Consulting?

Element Consulting is a construction management company dedicated to providing clients with responsible and innovative solutions to their project needs, from inception to completion. Based out of El Segundo, CA, the firm offers program, project, and construction management services. We invite you to join us in 'Bringing the Right Elements Together for Our Clients' Success'.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Project Scheduler
Project Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 155,000 - 175,000
Project Scheduler
Project Scheduler

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 155,000 - 175,000
Junior Scheduler
Junior Scheduler

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 110,000 - 130,000
Junior Scheduler
Junior Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 110,000 - 130,000
Associate Scheduler
Associate Scheduler

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 126,000 - 146,000
Advanced Construction Scheduler - P6 & Earned Value Analyst
Advanced Construction Scheduler - P6 & Earned Value Analyst

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 126,000 - 146,000
Senior Construction Scheduler in Los Angeles
Senior Construction Scheduler in Los Angeles

Energy Jobline ZR • Los Angeles (CA)

On-site
USD 110,000 - 170,000
Health Care Plan (Medical, Dental &amp
Vision
401k Plan
Senior Construction Scheduler
Senior Construction Scheduler

CLMI Group, LLC • Los Angeles (CA)

On-site
USD 75,000 - 100,000
Health Care Plan (Medical, Dental & Vision)
Retirement Plan (401k)
401k Matching
+2
Project Scheduler - Construction
Project Scheduler - Construction

CLMI Group • Los Angeles (CA)

On-site
USD 160,000 - 165,000
Salary Range: $160,000 - $165,000
Health Care Plan (Medical, Dental &amp
Retirement Plan (401k)
+3
Senior Construction Scheduler - Work Location: Los Angeles CA
Senior Construction Scheduler - Work Location: Los Angeles CA

PMCS Group • San Diego (CA)

On-site
USD 173,000 - 188,000