3rd Shift Production Assembler – Power Distribution (32.5h, $3 Premium)

Nutanix

Santa Ana (CA)

On-site

USD 47,000 - 49,000

Full time

6 days ago
Be an early applicant
Application generator

Don’t send a generic resume — generate a resume and cover letter tailored to this exact role.

Get past ATS filters

Benefits offered by this job

Full Benefits
401k plan
PTO
Paid holidays

Job summary

Eaton is seeking a Production Assembler for the 3rd shift in Santa Ana, CA. The role runs 10:00 pm–5:00 am with a 32.5-hour work week and a $3/hour shift premium. The candidate will build sub-assemblies and assemblies for Power Distribution Units and transformers, following SOPs and using cranes, fixtures, and hand tools.

Benefits include full medical and 401k, PTO, and paid holidays from day one. The environment emphasizes safety, quality, and continuous improvement with 5S practices.

Qualifications

  • Must be able to work in the United States without sponsorship now and in the future.
  • No relocation benefit is offered for this position.
  • Overtime is required as needed and shifts include a 32.5-hour work week.
  • Ability to read and interpret wiring diagrams and SOPs.
  • Ability to stand for extended periods and perform repetitive lifting.
  • Ability to use cranes to move transformers and materials.

Responsibilities

  • Assemble sub-assemblies and assemblies to customer specifications.
  • Follow SOPs to build components and sub-assemblies.
  • Use cranes to lift transformers and materials.
  • Perform visual inspections before and after assembly.
  • Use fixtures, gauges, and hand/power tools to assemble/repair products.
  • Conduct point-to-point wiring during assembly of Power Distribution Units.
  • Work with sheet metal for transformer components.
  • Operate oven and VPI tanks as part of the process.
  • Maintain 5S housekeeping and report safety improvements.

Skills

Mechanical skills
Electrical assembly
Reading wiring diagrams
Safety procedures
Crane operation
Lifting 40 lbs

Education

High School Diploma or GED

Tools

Crane
Hand tools
Power tools
Oven
VPI tanks

Job description

Eaton is seeking a Production Assembler for the 3rd shift in Santa Ana, CA. The role runs 10:00 pm–5:00 am with a 32.5-hour work week and a $3/hour shift premium. The candidate will build sub-assemblies and assemblies for Power Distribution Units and transformers, following SOPs and using cranes, fixtures, and hand tools.

Benefits include full medical and 401k, PTO, and paid holidays from day one. The environment emphasizes safety, quality, and continuous improvement with 5S practices.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

3rd-Shift Production Assembler: Wiring & Transformers
3rd-Shift Production Assembler: Wiring & Transformers

Eaton Corporation • Santa Ana (CA)

On-site
USD 46,000 - 48,000
Full Benefits and 401k plan
PTO and paid holidays
Health and Welfare benefits
+1
Production Assembler - 3rd Shift
Production Assembler - 3rd Shift

Eaton Corporation • Santa Ana (CA)

On-site
USD 46,000 - 48,000
Full Benefits and 401k plan
PTO and paid holidays
Health and Welfare benefits
+1
3rd Shift Production Supervisor: Safety & CI Leader
3rd Shift Production Supervisor: Safety & CI Leader

Eaton • Santa Ana (CA)

On-site
USD 99,000 - 145,000
3rd-Shift Electrical Test Technician
3rd-Shift Electrical Test Technician

Eaton • Santa Ana (CA)

On-site
USD 54,000 - 57,000
Full benefits
401(k) from day one
Overtime opportunities
3rd Shift Production Lead — Safety & CI Champion
3rd Shift Production Lead — Safety & CI Champion

Eaton Corporation • Santa Ana (CA)

On-site
USD 99,000 - 145,000
Sheet Metal Machinist – 3rd Shift (32.5h)
Sheet Metal Machinist – 3rd Shift (32.5h)

Eaton • Santa Ana (CA)

On-site
USD 32,000 - 39,000
Benefits including 401k
3rd Shift Sheet Metal Machinist
3rd Shift Sheet Metal Machinist

Nutanix • Santa Ana (CA)

On-site
USD 44,000 - 45,000
Full Benefits
401k from day one
2nd Shift Sub-Assembly Technician – Power Systems
2nd Shift Sub-Assembly Technician – Power Systems

Nutanix • City of Olean (NY)

On-site
USD 25,000 - 28,000
Health benefits
Vacation time
12 Paid holidays
+6
2nd Shift Electrical Test Technician
2nd Shift Electrical Test Technician

Eaton • Santa Ana (CA)

On-site
USD 44,000 - 50,000
Full benefits
401k plan
2nd Shift Production Leader: Drive Safety & Efficiency
2nd Shift Production Leader: Drive Safety & Efficiency

Eaton • Santa Ana (CA)

On-site
USD 99,000 - 145,000