A complete application in a minute — tailored resume and cover letter, ready to send.
Urbacon Saudi Company is recruiting a Planning Engineer in Saudi Arabia. The posting places the role at the interface between design and construction.
It monitors the engineering design stages, reviews consultant design plans and authority approvals so that design and construction programmes do not clash, and watches the procurement process so that materials reach site in line with the construction plan. The scheduling duties are set out at length.
Urbacon Saudi Company is recruiting a Planning Engineer in Saudi Arabia. The posting places the role at the interface between design and construction.
It monitors the engineering design stages, reviews consultant design plans and authority approvals so that design and construction programmes do not clash, and watches the procurement process so that materials reach site in line with the construction plan. The scheduling duties are set out at length.