Get more replies from employers
Send a job-specific resume in minutes.
Malaysia Rapid Transit Corporation Sdn. Bhd. is seeking a System Safety Assurance Engineer to support the Penang Mutiara Line Railway Systems team.
You will contribute to safety activities across multidisciplinary railway systems and coordinate with project teams and contractors. The role requires an engineering degree with CGPA 3.0 and prior experience in railway safety or safety-critical engineering. Metro, LRT, or MRt experience is highly relevant, and the position is offered on a 2-year
About the role
MRT Corp is seeking an experienced System Safety Assurance Engineer to support the Penang Mutiara Line Railway Systems team.
What you will do
Support system safety assurance activities across multidisciplinary railway systems and work with project teams, contractors and other technical stakeholders throughout design, integration, testing and project delivery. The role requires comfort with technical documentation, multidisciplinary interfaces, engineering reviews and project stakeholders.
What we are looking for
A relevant engineering degree with minimum CGPA of 3.0, and prior relevant experience in railway system safety, safety assurance or a closely related safety-critical engineering environment. Experience in metro, Light Rail Transit, Mass Rapid Transit, mainline rail or other safety-critical infrastructure is highly relevant.
Employment
Note: This position is offered on a 2-year fixed-term contract, with competitive benefits and an option for renewal based on performance.
MRT Corp was established in 2011 and is fully owned by the Minister of Finance (Incorporated). In 2017, MRT Corp successfully delivered the country’s first MRT line, MRT Kajang Line. This is followed by the MRT Putrajaya Line which was successfully delivered in 2023.
MRT Corp has also been appointed as the Malaysian InfraCo for the Rapid Transit System (RTS) Link Project between Johor Bahru and Singapore. The full opening of the line is targeted to be on 31 December 2026.
MRT Corp also plans and designs future metro rail networks and strive to be the catalyst in urban socio-economic regeneration by way of inclusive metro rail transport system and development of transit-oriented communities
MRT Corp was established in 2011 and is fully owned by the Minister of Finance (Incorporated). In 2017, MRT Corp successfully delivered the country’s first MRT line, MRT Kajang Line. This is followed by the MRT Putrajaya Line which was successfully delivered in 2023.
MRT Corp has also been appointed as the Malaysian InfraCo for the Rapid Transit System (RTS) Link Project between Johor Bahru and Singapore. The full opening of the line is targeted to be on 31 December 2026.
MRT Corp also plans and designs future metro rail networks and strive to be the catalyst in urban socio-economic regeneration by way of inclusive metro rail transport system and development of transit-oriented communities