An application made for this job — a tailored resume and cover letter that speak straight to the posting.
INSPUR COMMUNICATION MALAYSIA Sdn. Bhd. is seeking an experienced structural engineer to manage and coordinate structural construction works for data centre projects, ensuring drawings, specs, and schedules are followed.
The ideal candidate has a Bachelor's in Civil/Structural Engineering with 3+ years of experience, knowledge of reinforced concrete and steel structures, strong communication, and the ability to work on construction sites. Chinese language ability is an advantage.
Manage and coordinate structural construction works for data centre projects, ensuring compliance with approved drawings, specifications, and project schedules.
Key responsibilities
Review structural drawings, technical documents, method statements, and material submissions, and coordinate with consultants and contractors
Monitor on-site structural works, including foundations, concrete structures, steel structures, and other structural components
Conduct site inspections to ensure construction quality, workmanship, and compliance with relevant standards and project requirements
Coordinate with civil, architectural, MEP, and other engineering teams to identify and resolve structural issues during construction
Prepare and maintain construction records, inspection reports, progress reports, and other project documentation
About you
Bachelor's degree or above in Civil Engineering, Structural Engineering, or a related field
3+ years of relevant experience in structural engineering or construction projects
Experience in data centre construction projects is highly preferred
Strong knowledge of structural construction methods, reinforced concrete, steel structures, and relevant engineering standards
Good communication, coordination, and problem-solving skills, with the ability to work effectively on construction sites
Proficiency in Chinese is an advantage, especially for communication with Chinese-speaking project teams