Drafter / CAD Technician – Data Centre Construction Project

INSPUR COMMUNICATION MALAYSIA SDN. BHD.

Cyberjaya

On-site

MYR 36,000 - 72,000

Full time

3 days ago
Be an early applicant
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Inspur Communication Malaysia Sdn. Bhd. is seeking a CAD Drafter to prepare and update technical drawings, shop drawings, and layout plans using AutoCAD and BIM tools.

You will support engineers and project teams by developing detailed drawings from design specifications and site conditions. Ideal candidates hold a diploma or bachelor’s degree in engineering or architecture and have 2+ years of drafting experience in construction or engineering.

Qualifications

  • Diploma or Bachelor's degree in Civil, Mechanical, Electrical Engineering, Architecture, or related field.
  • 2+ years of relevant experience as a Drafter, CAD Technician, or similar role in construction or engineering projects.
  • Experience in data centre construction projects is highly preferred.
  • Proficiency in AutoCAD; experience with Revit or other BIM software is an advantage.

Responsibilities

  • Prepare and update technical drawings, shop drawings, layout plans, and construction drawings using AutoCAD or other relevant CAD software.
  • Assist engineers and project teams in developing detailed drawings based on design specifications, site conditions, and project requirements.
  • Review drawings for accuracy, consistency, and compliance with project specifications and relevant standards.
  • Coordinate with engineers, consultants, contractors, and other disciplines to resolve drawing discrepancies and technical issues.
  • Revise drawings based on design changes, site conditions, and engineering instructions, ensuring proper version control.
  • Maintain drawing registers, CAD files, as-built drawings, and other technical documentation throughout the project lifecycle.

Skills

Attention to detail
Team coordination
Chinese language (advantage)

Education

Engineering degree (Civil/Mechanical/Electrical/Architecture)

Tools

AutoCAD
Revit

Job description

This role involves preparing and updating technical drawings, shop drawings, layout plans, and construction drawings using AutoCAD or other relevant CAD software. You will assist engineers and project teams in developing detailed drawings based on design specifications, site conditions, and project requirements.

Key responsibilities

Prepare and update technical drawings, shop drawings, layout plans, and construction drawings using AutoCAD or other relevant CAD software

Assist engineers and project teams in developing detailed drawings based on design specifications, site conditions, and project requirements

Review drawings for accuracy, consistency, and compliance with project specifications and relevant standards

Coordinate with engineers, consultants, contractors, and other disciplines to resolve drawing discrepancies and technical issues

Revise drawings based on design changes, site conditions, and engineering instructions, ensuring proper version control

Maintain drawing registers, CAD files, as-built drawings, and other technical documentation throughout the project lifecycle

About you

Diploma or Bachelor's degree in Civil Engineering, Mechanical Engineering, Electrical Engineering, Architecture, or a related field

2+ years of relevant experience as a Drafter, CAD Technician, or similar role in construction or engineering projects

Experience in data centre construction projects is highly preferred

Proficiency in AutoCAD; experience with Revit or other BIM software is an advantage

Good understanding of construction drawings, technical details, and drawing standards, with strong attention to detail

Proficiency in Chinese is an advantage, especially for communication with Chinese-speaking project teams

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

CAD Drafter
CAD Drafter

NGAI CHIN CONSTRUCTION SDN. BHD. • Ulu Tiram

On-site
MYR 50,000 - 73,000
CAD Draughtsperson
CAD Draughtsperson

SeaOwl Malaysia • Kuala Lumpur

On-site
MYR 33,000 - 60,000
Document Control Engineer – Data Centre Construction Project
Document Control Engineer – Data Centre Construction Project

INSPUR COMMUNICATION MALAYSIA SDN. BHD. • Cyberjaya

On-site
MYR 67,000 - 112,000
Drafter
Drafter

Confidential Information • Puchong

On-site
MYR 36,000 - 58,000
Drafter (Specialist in Electrical Drawing)
Drafter (Specialist in Electrical Drawing)

Angsana Jaya Sdn. Bhd. • Kuching

On-site
MYR 36,000 - 58,000
CAD Draughtsman (Architectural, Interior Design)
CAD Draughtsman (Architectural, Interior Design)

Private Advertiser • Miri

On-site
MYR 42,000 - 72,000
CAD Drafter (Civil, Structural & Estate Infrastructure)
CAD Drafter (Civil, Structural & Estate Infrastructure)

Teck Guan Group • Tawau

On-site
MYR 30,000 - 60,000
Structural Engineer – Data Centre Construction Project
Structural Engineer – Data Centre Construction Project

INSPUR COMMUNICATION MALAYSIA SDN. BHD. • Cyberjaya

On-site
MYR 72,000 - 120,000
Precision CAD Drafter - Engineering Drawings
Precision CAD Drafter - Engineering Drawings

1230420D • Kuching

On-site
MYR 35,000 - 60,000
Drafter
Drafter

1230420D • Kuching

On-site
MYR 35,000 - 60,000