Turn this role into an interview — a resume and cover letter built around what this employer wants.
Edra Power Holdings Sdn Bhd is seeking an experienced electrical technician to support daily routine preventive maintenance and upgrades at its solar site. You will assist the O&M supervisor, monitor equipment performance, and perform inspections to ensure reliability with minimal disruption.
Requirements include a Diploma in Electrical / Electrical (Power) Engineering, 3+ years in electrical work, and A4 Chargeman EC certification. NTSP is an added advantage for the role in Malaysia.
To perform daily routine inspection, repairs, preventive and schedule maintenance activities of plant equipment/installations as assigned in accordance with Contract requirements and prudent practices. To monitor, report and assist on improvement of operating equipment/installation to ensure reliable and dependable quality services with minimum disruption to operations.
Key responsibilities
Assist Solar O&M Supervisor in daily routine preventive maintenance activities and ensure Plant equipment/installations are maintained at best performance and efficiency
Perform Daily Operator Walk-down to observe and record on-site condition and parameter readings of Plant equipment as per checklist
Perform maintenance works on electrical motors, switchgears, transformers, switchboards, UPS and other equipment/installation in the plant
Operate and maintain the Plant in accordance with contractual obligations and prudent practices
Record and register O&M activities for appropriate documentation and reference
Execute O&M tasks based on OEM recommendations and standards to ensure all Contract requirements are met
Perform troubleshooting on any operational issues and findings
Replacement/installation of hardware, PV modules, inverters, monitoring equipment and any other component within the solar site
Participate in planned outage inspection and maintenance activities prior, during and after as per Plant's Annual Outage plan
Assist in identifying critical spare parts requirements and maintain adequate safety stock levels
About you
Diploma in Electrical / Electrical (Power) Engineering from a recognized University or learning institution
Minimum 3 years or sufficient years of experience related to the work scope
Certified competent A4 Chargeman from EC
Experience in electrical field
Experience working in large scale solar farm
Hands on with analytical and supervisory skills
Team player
Communication and reading skills
NIOSH TENAGA SAFETY PASSPORT (NTSP) issued by NIOSH (optional/added advantage)
Edra Power Holdings Sdn Bhd (“Edra”) owns and operates 8 power plants in Malaysia, Egypt and Bangladesh. It also has investments in a power asset in Pakistan, as well as a power and desalination asset in the United Arab Emirates.
Edra is the second largest independent power producer (IPP) in Malaysia, with a total generating capacity of 5,087 MW and effective capacity of 4,568.3 MW from its 5 power plants, which consist of 3 combined cycle gas turbine plants (one with co-generation facilities), one coal-fired sub-critical thermal power plant and one large scale solar photovoltaic plant.
In Egypt, the Group owns and operates one 682.5 MW gas-fired conventional thermal power.
In Bangladesh, the Group owns and operates two CCGT power plants, with a total generating capacity of 810 MW and effective capacity of 445.5 MW.
The Group has an investment in a 157 MW combined cycle gas-fired baseload power station located in Pakistan. Its effective capacity is 36 MW.
Edra is also part of a consortium that owns and operates the Taweelah B IWPP, the largest independent water and power project in the UAE. The Group has a 10.0% effective interest in the Taweelah B IWPP, which has a total power generation and desalination capacity of 2,000 MW and 160 MIGD.
The Group’s revenues are mainly derived from the available capacity and electrical energy produced by its power plants to the off-taker under their respective Power Purchase Agreements (\"PPAs\").
Tenaga Nasional Berhad is our sole off-taker in Malaysia, while Egyptian Electricity Holding Company and Bangladesh Power Development Board are our sole off-takers in Egypt and Bangladesh respectively. These off-takers are either government or government-linked entities. Our PPAs in Egypt and Bangladesh are guaranteed by the Central Bank of Egypt and Government of Bangladesh respectively, with the substantial majority of payments either denominated in, or indexed to, the USD.
Edra is led by experienced management teams with deep industry knowledge, expertise and established track records, which are further supported by strategic partnerships with reputable global players.
We are looking forward to further expansion opportunities in the markets where we already have a strong foothold as well as in new areas.
Edra Power Holdings Sdn Bhd (“Edra”) owns and operates 8 power plants in Malaysia, Egypt and Bangladesh. It also has investments in a power asset in Pakistan, as well as a power and desalination asset in the United Arab Emirates.
Edra is the second largest independent power producer (IPP) in Malaysia, with a total generating capacity of 5,087 MW and effective capacity of 4,568.3 MW from its 5 power plants, which consist of 3 combined cycle gas turbine plants (one with co-generation facilities), one coal-fired sub-critical thermal power plant and one large scale solar photovoltaic plant.
In Egypt, the Group owns and operates one 682.5 MW gas-fired conventional thermal power.
In Bangladesh, the Group owns and operates two CCGT power plants, with a total generating capacity of 810 MW and effective capacity of 445.5 MW.
The Group has an investment in a 157 MW combined cycle gas-fired baseload power station located in Pakistan. Its effective capacity is 36 MW.
Edra is also part of a consortium that owns and operates the Taweelah B IWPP, the largest independent water and power project in the UAE. The Group has a 10.0% effective interest in the Taweelah B IWPP, which has a total power generation and desalination capacity of 2,000 MW and 160 MIGD.
The Group’s revenues are mainly derived from the available capacity and electrical energy produced by its power plants to the off-taker under their respective Power Purchase Agreements (\"PPAs\").
Tenaga Nasional Berhad is our sole off-taker in Malaysia, while Egyptian Electricity Holding Company and Bangladesh Power Development Board are our sole off-takers in Egypt and Bangladesh respectively. These off-takers are either government or government-linked entities. Our PPAs in Egypt and Bangladesh are guaranteed by the Central Bank of Egypt and Government of Bangladesh respectively, with the substantial majority of payments either denominated in, or indexed to, the USD.
Edra is led by experienced management teams with deep industry knowledge, expertise and established track records, which are further supported by strategic partnerships with reputable global players.
We are looking forward to further expansion opportunities in the markets where we already have a strong foothold as well as in new areas.
Perks and benefits We offer competitive compensation and benefits pac