An application made for this job — a tailored resume and cover letter that speak straight to the posting.
KUZU GROUP is seeking an Assistant Project Manager (Site Manager – Civil) to oversee on-site execution at the South Al-Mutlaa site. The role requires coordinating heavy equipment, subcontractors, and site workflows in line with approved drawings and specifications.
Fluent English is required; Arabic is an asset for liaison with Kuwaiti authorities and suppliers. Minimum 15 years of field execution experience on large water/wastewater or heavy civil projects is expected.
Position Title: Assistant Project Manager (Site Manager – Civil)
Project Phase: Mobilisation and Construction Execution
Reports To / Direct Reports: Reports directly to the Project Manager. Direct reports include Senior Civil Engineers, Mechanical Engineers, Electrical/I&C Engineers, General Site Superintendents, and Survey Engineers.
Maintain full-time, direct operational control over the South Al-Mutlaa site, coordinating workforce logistics, heavy equipment, subcontractors, and work-front sequencing in accordance with approved shop drawings and specifications.
Minimum Qualifications: B.Sc. in Civil Engineering.
Required Experience: Minimum 15 years of field execution experience in projects of a similar type and value scale (large-scale water/wastewater treatment plants or heavy civil infrastructure).
Technical Competencies: Deep excavation, dewatering, water-retaining structures (BS 8007 / ACI 350), mass concrete pours, interface sequencing.
Language Requirements: Fluent written and spoken English is required; English is the working language for all correspondence, submittals, and reporting to MPW and the Consultant. Arabic is a distinct asset for liaison with Kuwaiti authorities, local suppliers, and the workforce.
Key Interfaces: Consultant Site Inspectors, Subcontractor Site Managers, HSE Engineer, QA/QC Field Engineers, Procurement Logistics Team.
Key Deliverables: Daily site activity logs, 3-week look-ahead schedules, field inspection requests (RFIs), subcontractor resource allocation charts.
KPIs: Achievement of weekly physical milestones; reduction of re-work / non-conformance reports (NCRs); on-time closure of site observation notices.