Stand out for this role — generate a tailored resume and cover letter in about a minute.
EMW is seeking contractor support to manageDeployable Communication and Information Systems assets at the DACCC in Poggio Renatico, Italy. The role requires identifying, cataloguing, and inventorying D-CIS equipment, determining the correct system of record, and inputting data.
You will conduct regular warehouse inspections and provide reporting to the CSS Division during a six-month base period with extension options.
Deadline Date: Thursday 22 October 2026
Requirement: Provision of Support Services for the Management of Deployable Communication and Information Systems at Deployable Air Command & Control Centre (DACCC)
Location: Poggio Renatico, Italy
Full Time On-Site: Yes
Time On-Site: 100%
Total Scope of the request (hours): BASE 2026: approx. 300 hrs (1 Contractor * 150 h/month)
Option 2027:
Option 1: 600 hrs for 01 Jan - 31. April 2027
Option 2: 900 hrs for additional 6 months
Period of Performance: 2026 BASE period: As soon as possible, but no later than 01 November 2026 (tentative) until 31 December 2026.
2027 OPTION period:
Option1: 01 Jan - 31 March 2027
Option2: Additional 6 months beyond 31 March 2027
Required Security Clearance: NATO SECRET
Special Terms and Conditions: The contractor will be responsible for complying with the respective national requirements for working permits, visas, taxes, social security etc. whilst working on site at D.A.C.C.C, Poggio Renatico, Italy
No special status is either conferred or implied by the host organisation, D.A.C.C.C, Italy to the contractor whilst working on site.
Documents required for on-boarding:
a. This requirement addresses the need for proper accountability and management of Deployable Communication and Information Systems (D-CIS) currently deposited at the DACCC. At present, D-CIS systems are not fully recorded in any centralized logistics system. Certain components are owned by NCIA, while others were procured through NSPA. However, the D-CIS capabilities were delivered as complete systems, and individual components have not been systematically registered in any logistics system of record.
b. As DACCC is now the designated user and responsible authority on behalf of ACO for managing this equipment, there is currently no clear guidance on which items should be recorded in which system. DACCC therefore requires expert support to:
c. DACCC personnel do not possess the required system expertise. Additionally, only two of five authorized posts are currently occupied. During the last AIRCOM AI visit, related to the DACCC trial structure, it was agreed that, of the five posts currently identified in the Post Establishment (PE), three additional posts should be created to adequately manage all logistics tasks related to the Warehouse.
Until additional posts can be covered by nations or converted into temporary civilian positions, contractor support is essential.
a. DACCC requires support services to assist the Combat Service Support Division (CSS) in identifying, cataloguing, and inventorying all D-CIS equipment (e.g., DADR, GAG).
b. The contractor shall:
c. Services shall be:
d. Deliverables:
a. Contractor support is required as soon as possible, as the equipment has not been properly tracked since its transfer to DACCC.
b. Estimated Initial Period of Performance:
Start Date: 1 November 2026 (tentative)
End Date: 30 April 2027 (estimated).
Option: 6 months extension
c. The anticipated duration of the support requirement is six (6) months, with one (1) option to extend for an additional six (6) months.
This period corresponds to the estimated timeframe required to convert the current uncovered posts into temporary civilian positions, recruit and onboard permanent replacements, and address the staffing gap caused by the three vacant positions.
While the expected duration of intensive support is six (6) months, the extension option provides flexibility depending on the time required to complete equipment identification, inventory validation, and system integration.
[See Requirements]
a. DACCC will provide all necessary infrastructure, including:
b. System access will be granted in accordance with applicable IT and security policies.
Contractor personnel must comply with all NATO and AIRCOM security regulations.
Requirements include:
For the services under this SOW we require 3 resources, with the following skills and experience:
a. Required Expertise:
b. Required Qualifications:
c. Contractor personnel shall support all material management activities and ensure knowledge transfer to maintain continuity after contract completion.
Contractor personnel must comply with all NATO and AIRCOM security regulations.
Requirements include: