Senior Engineer/Assistant Manager/Deputy Manager - PPC

Arce Polymers

Hyderabad

On-site

INR 900,000 - 1,200,000

Full time

7 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Arce Polymers in Hyderabad seeks an Assistant Manager PPC to lead end-to-end production scheduling for injection molding and assembly lines. You will formulate Master Production Schedules, allocate jobs across machines, and drive on-time, in-full dispatches while minimizing changeover downtime.

The ideal candidate has 6–10 years in PPC in plastics, with hands-on SAP PP/MM, SMED, and strong inventory control. Experience with electrical switchgear components or precision assemblies is preferred.

Qualifications

  • Formulate Master Production Schedules (MPS) and detailed daily/weekly loading plans based on sales orders and delivery priorities.
  • Sequence production to minimize setup and mold changeover downtime (SMED) and reduce purge losses.
  • Plan and track availability for engineering plastics, FR/V-0 resins, and commodity polymers; coordinate with procurement for clearance before production.

Responsibilities

  • Formulate Master Production Schedules (MPS) and detailed daily/weekly shift-wise machine-loading plans based on sales orders, customer forecasts, and delivery priorities.
  • Allocate jobs across injection molding machines (50T to 650T) based on mold compatibility, platen size, tonnage, and cycle time parameters.
  • Sequence production to minimize setup and mold changeover downtime (SMED) and avoid excessive color/material change purge losses.
  • Plan and balance production runs for multi-component kits, insert-molded parts, and sub-assembly requirements for switchgear products.
  • Plan and track availability for engineering plastics, flame-retardant (FR/V-0) resins, and commodity polymers (PA6/PA66, PBT, PC, ABS, POM, PP), masterbatches, metal inserts, and packaging materials.
  • Coordinate with Purchase, Stores, and Quality Assurance to ensure raw materials are cleared through inward inspection (GRN/IQC) well ahead of production schedules.
  • Manage regrind/reprocessed material blending within approved customer tolerances while keeping regrind inventory in check.
  • Maintain optimum Min-Max inventory levels across RM, WIP, and FG to prevent line stoppages while keeping inventory carrying costs lean.
  • Partner with the Tool Room to align mold availability, scheduled preventive maintenance (PM), mold refurbishments, and new tool trials (T0, T1, PPAP validation runs).
  • Ensure critical auxiliary units (dehumidifier dryers, Mold Temperature Controllers (MTC), hot runner controllers, and robotic pickers) are staged and aligned with machine allocations.
  • Track daily actual output against the planned schedule, investigate root causes of variances (breakdowns, cycle time lags, quality rejections), and execute immediate recovery plans.
  • Monitor Overall Equipment Effectiveness (OEE), machine availability, scrap percentage, and downtime metrics.
  • Coordinate with Dispatch and Logistics teams to ensure finished goods are cleared, packed, and shipped to meet OTIF delivery commitments.
  • Maintain and audit Bills of Materials (BOM), production routings, and standard cycle times in the ERP/SAP system.
  • Drive shop-floor operational discipline, supporting 5S, Kaizen, Lean manufacturing, and waste reduction initiatives.
  • Prepare and present daily/monthly MIS reports: Daily Production Report (DPR), Machine Utilization, Plan vs. Actual Variance, Scrap Analysis, and Customer OTIF.

Skills

PPC planning
ERP/SAP PP/MM
Injection molding
OEE tracking
Inventory control
Cross-functional coordination
Data-driven decisions

Education

B.Tech/B.E./Diploma in Mechanical, Plastics Eng (CIPET) or Production Engineering

Tools

SAP PP/MM

Job description

Role & responsibilities


The Assistant Manager PPC is responsible for end-to-end production scheduling, machine capacity planning, raw material availability and shop-floor execution tracking across thermoplastic injection molding and assembly lines.

This role ensures maximum machine utilization, minimizes mold changeover downtime, controls WIP/FG inventory levels and delivers 100% On-Time In-Full (OTIF) dispatches, with a primary focus on Electrical Switchgear components, as well as automotive and industrial product lines.


Key Responsibilities & Deliverables


  • Formulate Master Production Schedules (MPS) and detailed daily/weekly shift-wise machine-loading plans based on sales orders, customer forecasts, and delivery priorities.
  • Allocate jobs across injection molding machines (50T to 650T) based on mold compatibility, platen size, tonnage, and cycle time parameters.
  • Sequence production to minimize setup and mold changeover downtime (applying SMED principles) and avoid excessive color/material change purge losses.
  • Plan and balance production runs for multi-component kits, insert-molded parts, and sub-assembly requirements for switchgear products.
  • Plan and track availability for engineering plastics, flame-retardant (FR/V-0) resins, and commodity polymers (PA6/PA66, PBT, PC, ABS, POM, PP), masterbatches, metal inserts, and packaging materials.
  • Coordinate with Purchase, Stores, and Quality Assurance to ensure raw materials are cleared through inward inspection (GRN/IQC) well ahead of production schedules.
  • Manage regrind/reprocessed material blending within approved customer tolerances while keeping regrind inventory in check.
  • Maintain optimum Min-Max inventory levels across RM, WIP, and FG to prevent line stoppages while keeping inventory carrying costs lean.
  • Partner with the Tool Room to align mold availability, scheduled preventive maintenance (PM), mold refurbishments, and new tool trials (T0, T1, PPAP validation runs).
  • Ensure critical auxiliary units (dehumidifier dryers, Mold Temperature Controllers (MTC), hot runner controllers, and robotic pickers) are staged and aligned with machine allocations.
  • Track daily actual output against the planned schedule, investigate root causes of variances (breakdowns, cycle time lags, quality rejections), and execute immediate recovery plans.
  • Monitor Overall Equipment Effectiveness (OEE), machine availability, scrap percentage, and downtime metrics.
  • Coordinate with Dispatch and Logistics teams to ensure finished goods are cleared, packed, and shipped to meet OTIF delivery commitments.
  • Maintain and audit Bills of Materials (BOM), production routings, and standard cycle times in the ERP/SAP system.
  • Drive shop-floor operational discipline, supporting 5S, Kaizen, Lean manufacturing, and waste reduction initiatives.
  • Prepare and present daily/monthly MIS reports: Daily Production Report (DPR), Machine Utilization, Plan vs. Actual Variance, Scrap Analysis, and Customer OTIF.

Preferred candidate profile

  • Education: B.Tech / B.E. / Diploma in Mechanical, Plastics Engineering (CIPET), or Production Engineering.
  • Experience: 6 to 10 years of hands-on PPC experience in Plastic Injection Molding plants, with a strong preference for candidates handling components for Electrical Switchgears (MCBs, MCCBs, contactors, electrical enclosures) or precision engineering assemblies.
  • Technical Skills:
    • Hands-on expertise in ERP/SAP (PP/MM modules).
    • Strong working knowledge of engineering plastics (PA6, PA66, PBT, PC-FR) and insert molding.
    • Practical understanding of mold changeover optimization (SMED), OEE tracking and inventory control.
  • Soft Skills: Strong cross-functional coordination, quick crisis management and data-driven analytical skills.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Ppc Executive
Ppc Executive

Polybond • Alandi

On-site
INR 300,000 - 550,000
Head PPC Plant (SMT)
Head PPC Plant (SMT)

Varroc • Pune District

On-site
INR 1,500,000 - 2,100,000
PPC Manager
PPC Manager

IMW Engineering • Dadri, Pune District, Bengaluru

On-site
INR 1,100,000 - 1,700,000
Mould Manufacturing Process Planning & Control
Mould Manufacturing Process Planning & Control

ISBMaster • Fursungi

On-site
INR 900,000 - 1,300,000
Production Planning & Control (PPC) – Senior Engineer
Production Planning & Control (PPC) – Senior Engineer

N Human Resources & Management Systems • Pithampur

On-site
INR 700,000 - 1,000,000
MGR (PPC)
MGR (PPC)

Bajaj Auto Limited • India

On-site
INR 1,200,000 - 2,400,000
Assistant Manager Production- EPP
Assistant Manager Production- EPP

Paracoat Products Ltd. • Talegaon Dabhade, Bhiwadi

On-site
INR 800,000 - 1,400,000
Senior Manager / AGM - Supply Chain Management
Senior Manager / AGM - Supply Chain Management

Arce Polymers • Hyderabad

On-site
INR 1,400,000 - 2,200,000
Assistant Manager - PPC (Production Planning & Control)
Assistant Manager - PPC (Production Planning & Control)

CYIENT DLM • Mysuru

On-site
INR 1,500,000 - 2,100,000
Moulding Plant Manager
Moulding Plant Manager

The Flower Puff Girlz • Palghar

On-site
INR 1,500,000 - 2,100,000