Formwork Foreman

Larsen & Toubro

Chennai District

On-site

INR 600,000 - 900,000

Full time

14 days+

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

A leading construction firm is looking for a Formwork Foreman to supervise MIVAN Aluminium Formwork and manage conventional formwork systems for high-rise residential buildings. The role requires strong hands-on experience, ensuring safety, quality, and timely project completion. Candidates should possess ITI or Diploma in Civil Engineering and have 3-8 years of relevant experience. Strong leadership and problem-solving skills are essential in this position.

Qualifications

  • 3–8 years of experience in residential building construction MIVAN Aluminium Formwork.
  • Strong knowledge of formwork sequencing for high-rise residential floors.
  • Excellent understanding of safety standards related to shuttering and lifting.

Responsibilities

  • Supervise and execute MIVAN formwork for various structural elements.
  • Coordinate with engineers for shutter closing readiness.
  • Enforce safety practices during formwork activities.

Skills

MIVAN Aluminium Formwork
Leadership
Communication
Problem-solving

Education

ITI / Diploma in Civil Engineering

Job description

Formwork Foreman – High?Rise Residential Buildings (MIVAN & Conventional Formwork)

The Formwork Foreman is responsible for supervising and executing all formwork activities for high-rise residential building structures. The role requires strong hands‑on experience in MIVAN Aluminium Formwork, while also managing conventional and modular shuttering for podiums, basements, and non-MIVAN areas. The candidate must ensure safe, quality, and timely completion of structural work floors in a residential tower.

Key Responsibilities
  • MIVAN Aluminium Formwork (Primary Responsibility)
  • Execute and supervise MIVAN formwork for:
    • Shear walls and partition walls
    • Slabs and beams
    • Columns and lift cores
    • Staircases and landing areas
    • Balcony and façade elements (where applicable)
  • Achieve planned cycle times (daily/2-day/3-day cycle) for high‑rise residential floors.
  • Ensure correct alignment, plumb, line, and level of panels before concreting.
  • Inspect MIVAN panels for dents, damage, misalignment, and coordinate repairs.
  • Ensure proper shuttering oil application, joint tightening, and tie‑rod fixing to avoid leakage or honeycombing.
  • Conventional & Other Formwork Systems
  • Supervise non‑MIVAN formwork for:
    • Podiums
    • Basements
    • Water tanks
    • Sumps, ramps, retaining walls
    • Lift machine rooms and terrace structures
  • Manage MS shuttering, plywood formwork, modular systems, and cuplock scaffolding.
  • Ensure correct support spacing, safe propping/de‑propping, and structural stability.
Planning & Coordination
  • Coordinate with structural engineers, MEP teams, and bar‑bending teams to ensure readiness of all embeds, sleeves, conduits, and reinforcement before shutter closing.
  • Work with concrete teams to ensure smooth sequencing of pour cycles.
  • Plan manpower requirements for carpenters, helpers, and shifting crews.
  • Ensure MIVAN and conventional shuttering zones do not clash in mixed‑residential block layouts.
Safety & Quality Assurance
  • Enforce safety practices for working at height, panel lifting, de‑shuttering, and prop shifting.
  • Conduct toolbox talks and ensure PPE compliance.
  • Check MIVAN surfaces after de‑shuttering for:
    • Honeycombing
    • Blowouts
    • Surface finish quality
  • Ensure slab soffit and wall shutter removal follows structural curing and stripping guidelines.
Material & Inventory Control
  • Maintain inventory records of:
    • MIVAN panels, wall ties, pins, wedges, soldiers, props, beams, and scaffolding
  • Ensure timely repair, cleaning, and proper stacking of panels after stripping.
  • Avoid damage, wastage, or loss of shuttering materials.
Documentation & Reporting
  • Update daily progress of MIVAN and conventional formwork activities.
  • Maintain checklists, formwork inspection records, and de‑shuttering logs.
  • Report delays, constraints, and manpower/material shortages to the Site Engineer/Section Incharge.
Qualifications & Skills
  • ITI / Diploma in Civil Engineering (preferred)
  • 3–8 years of experience in residential building construction MIVAN Aluminium Formwork
  • Strong knowledge of:
    • Formwork sequencing for high‑rise residential floors
    • Structural drawings, MIVAN shop drawings, and pour plans
    • Safety standards related to shuttering, height work, and lifting
  • Excellent leadership, communication, and problem‑solving skills.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Engineer - Formwork - Site
Engineer - Formwork - Site

Larsen & Toubro • Chennai District

On-site
INR 335,000 - 614,000
Project Manager Civil
Project Manager Civil

Habrick Construction • Mumbai Suburban

On-site
INR 1,800,000 - 2,700,000
Senior Engineer / AM (Formwork)
Senior Engineer / AM (Formwork)

Shapoorji Pallonji Group • Bhopal, Pune District

On-site
INR 600,000 - 900,000
Engineer - Formwork - Site
Engineer - Formwork - Site

PeopleStrong • Chennai District

On-site
INR 650,000 - 900,000
Sr GM/GM - Projects
Sr GM/GM - Projects

Prestige Group • Delhi

On-site
INR 2,500,000 - 4,000,000
Construction Manager
Construction Manager

Larsen & Toubro • Chennai District

On-site
INR 1,200,000 - 1,800,000
Senior Engineer - Structures
Senior Engineer - Structures

Svadha WASH Pvt. Ltd. • Hyderabad

On-site
INR 900,000 - 1,300,000
Senior Engineer - Structures
Senior Engineer - Structures

Svadha Builders • Hyderabad

On-site
INR 800,000 - 1,200,000
Assistant General Manager - Projects
Assistant General Manager - Projects

Royal Land Developers • Mettuteruvu

On-site
INR 900,000 - 1,500,000
Shuttering Foreman
Shuttering Foreman

NV Infra • Chennai District

On-site
INR 480,000 - 720,000
Opportunity for professional growth
Stable work environment
Direct involvement in high-quality projects