Stand out for this role — generate a tailored resume and cover letter in about a minute.
Hindalco's Sheet Rolling plant at Belur, near Kolkata, seeks a focused maintenance professional to drive preventive maintenance, reliability improvements, and cost controls across heavy rolling equipment. You will engage in root-cause analysis, Kaizen ideas, and safe, efficient maintenance planning within a modernised, ERP-enabled environment.
The role emphasizes reducing downtime, managing spares, and enforcing ISO/OHSAS standards while contributing to energy management and capital projects.
Job Purpose Description
The Sheet rolling at Belur (very near to Kolkata) was the first plant of Indal to be set up way back in 1943. The initial capacity of the plant was 2500 tons per annum. Over the time, there has been numerous expansion and modernisation and the present capacity of the plant is about 52000 tons per annum.
Since the plant is very old, the equipment and the technology are quite outdated except for certain pockets of excellence like SMS Cold Rolling mill. The plant has the usual baggage for outdated practices. But over the last three years there has been significant restructuring and the attitude of the workmen and practices have undergone a sea- change,
The strategic direction of the Hindalco Sheet Business is shifting towards more value added as Hindalco is priced out of the common segments. As a result, the value added share for the plant output has seen significant increases. The value added output do not come cheap but calls for substantial changes in workmanship and customer orientation. The plant has been able to meet the challenges.
Along with the modernisation in plant and equipment, the business processes in the plant have also been modernised. An ERP system based on Oracle and Orafin has been successfully implemented in the plant.
Preventive Maintenance: To achieve zero breakdowns by adhering to the maintenance schedule. Tracking the breakdown and to find a trend of the break down in the equipment.
To work out Why -Why analysis and find the root cause of a problem
Implement the Kaizen Idea for Continual Improvement.
To maximize the P.M Adherence during the preventive maintenance jobs.
Improving equipment reliability by designing changes in equipments. To implement subtle changes in the design stage of equipment parts to increase the factor of safety and to eliminate the design related defect that lead to breakdown.
Monitor spares and track costs to keep within P&B. Tracking the record of the spares
Monitoring the condition of spare regularly.
Control Hydraulic Oil Consumption and its accessory element.
Reduction of Downtime hrs
Removing unsafe conditions and adhering to OPEX To adhere with the monthly CO2 Checking.
To eliminate unsafe condition
House Keeping Related jobs.
To adhere with 5-S internal auditing.
To maintain all the documents of ISO 9000-2000, ISO-14000, OHSAS-18000 for mechanical department
To implement in-house developments for energy saving activities
To educate, motivate and involve employees in the department in fulfillment of departmental objectives, prepare annual training plan.