Transmission Estimator: T&E & Change-Order Specialist

careers-quanta

Rapid City (SD)

On-site

USD 90,000 - 125,000

Full time

10 days ago
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Brink Constructors, Inc. is seeking an Estimator based in Rapid City, SD, within the Pre-Construction department. You will produce time-and-equipment estimates, work-order pricing, and change-order pricing for key utility clients under master/service agreements.

This exempt/salary role reports to the Lead Estimator – Transmission and supports hard-bid, unit-price, and pricing for multiple projects. Travel is approximately 10–20% and pay ranges from $90,000 to $125,000 annually.

Qualifications

  • 2+ years of relevant experience in estimating, project engineering, or project controls for electric transmission and distribution.
  • Strong command of Microsoft Excel, including formulas and lookups.
  • Ability to read and interpret plan-and-profile drawings and construction docs.
  • Ability to manage multiple pricing requests against firm deadlines.
  • Pre-employment requirements include pre-screening and driving license validity.

Responsibilities

  • Prepare T&E estimates, work-order pricing, and budgetary pricing for assigned utility clients.
  • Build labor estimates from crew composition and productivity.
  • Develop equipment hour and duration estimates for various equipment.
  • Price materials, subcontracted work, rental, per diem, subsistence, travel, and mobilization costs.
  • Turn around routine T&E pricing requests within client deadlines.
  • Estimate maintenance, small-capital, and storm-response work.
  • Price change orders and extra work orders on active projects.
  • Document pricing assumptions and rate references for traceability.
  • Maintain current copies of client rate schedules and contract terms.

Skills

Estimating
Excel
Blueprints
Client interaction
Driver's license

Education

Bachelor's degree

Tools

HCSS/HeavyBid
Bluebeam Revu
AutoCAD
GIS tools
InEight
B2W

Job description

Brink Constructors, Inc. is seeking an Estimator based in Rapid City, SD, within the Pre-Construction department. You will produce time-and-equipment estimates, work-order pricing, and change-order pricing for key utility clients under master/service agreements.

This exempt/salary role reports to the Lead Estimator – Transmission and supports hard-bid, unit-price, and pricing for multiple projects. Travel is approximately 10–20% and pay ranges from $90,000 to $125,000 annually.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Transmission Estimator — Fast-Paced T&E & Change Orders
Transmission Estimator — Fast-Paced T&E & Change Orders

Brink Constructors, Inc. • Rapid City (SD)

On-site
USD 90,000 - 125,000
Transmission Estimator: Rapid T&E and Crew Planning
Transmission Estimator: Rapid T&E and Crew Planning

Quanta Services, Inc. • Rapid City (SD)

On-site
USD 90,000 - 125,000
401(k) with company match
Paid Holidays and PTO
Parental Leave
+1
Estimator - Transmission
Estimator - Transmission

Brink Constructors, Inc. • Rapid City (SD)

On-site
USD 90,000 - 125,000
Estimator — Utility T&E & Change-Order Pricing
Estimator — Utility T&E & Change-Order Pricing

Quanta Services, Inc. • Princeton Township (MN)

On-site
USD 90,000 - 120,000
Estimator - Transmission
Estimator - Transmission

Quanta Services, Inc. • Princeton Township (MN)

On-site
USD 90,000 - 120,000
Substation Estimator—Kickstart Your Power-Grid Career
Substation Estimator—Kickstart Your Power-Grid Career

Brink Constructors, Inc. • Rapid City (SD)

On-site
USD 65,000 - 85,000
401(k) with company match
Paid Holidays and PTO
Parental Leave
+3
Emerging Estimator – Electrical Utilities & Substations
Emerging Estimator – Electrical Utilities & Substations

Quanta Services, Inc. • Rapid City (SD)

On-site
USD 65,000 - 85,000
401(k) with company match
Paid Holidays and PTO
Parental Leave
+6
T&D Estimator — Fast-Paced Time & Equipment Pricing
T&D Estimator — Fast-Paced Time & Equipment Pricing

Brink Constructors, Inc. • Princeton (MN)

On-site
USD 90,000 - 120,000
401(k) with company match
Paid Holidays
PTO
+7
T&D Estimator: Fast-Turnaround Time & Equipment Pricing
T&D Estimator: Fast-Turnaround Time & Equipment Pricing

Quanta Services, Inc. • Princeton (MN)

On-site
USD 90,000 - 120,000
401(k) with company match
Paid Holidays and PTO
Parental Leave
+6
T&D Estimator I — Electrical Project Costing
T&D Estimator I — Electrical Project Costing

Great Southwestern Construction • Castle Rock (CO)

On-site
USD 76,000 - 129,000
Medical benefits
Dental coverage
401(k) with company match
+2